Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Request for Proposals for a Construction Manager at Risk for Sterling Elementary School addition and renovations.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Construction manager-at- risk using the one-step process for services associated with construction of the high school gym & locker room addition and renovations.
Posted Date
Jan 15, 2026
Due Date
Feb 2, 2026
Release: Jan 15, 2026
Close: Feb 2, 2026
Construction manager-at- risk using the one-step process for services associated with construction of the high school gym & locker room addition and renovations.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes, but is not limited to: the demolition of the existing main building, weight training building, 50 meter with dive well pool with pump house, wading pool and pool deck. Construction will include a new 25 yard (length) by 50 meter (width), 10 lane pool with a separate dive well and moveable bulkhead with traditional diving (two 1 meter and one 3 meter boards set-up), the addition of a new interactive 0-2.5’ depth play pool. See attached file for full scope.
Posted Date
Jan 16, 2026
Due Date
Mar 4, 2026
Release: Jan 16, 2026
Close: Mar 4, 2026
The project includes, but is not limited to: the demolition of the existing main building, weight training building, 50 meter with dive well pool with pump house, wading pool and pool deck. Construction will include a new 25 yard (length) by 50 meter (width), 10 lane pool with a separate dive well and moveable bulkhead with traditional diving (two 1 meter and one 3 meter boards set-up), the addition of a new interactive 0-2.5’ depth play pool. See attached file for full scope.
AvailableProject consists of interior architectural renovations, all new MEP systems, and various sitework at an existing elementary school. The scope also includes a small building addition. Bids will be received for the following work: general building construction, mechanical construction, plumbing construction, electrical construction, food service construction, roofing construction.
Posted Date
Jan 3, 2026
Due Date
Feb 5, 2026
Release: Jan 3, 2026
Close: Feb 5, 2026
Project consists of interior architectural renovations, all new MEP systems, and various sitework at an existing elementary school. The scope also includes a small building addition. Bids will be received for the following work: general building construction, mechanical construction, plumbing construction, electrical construction, food service construction, roofing construction.
AvailableProject consists of interior architectural renovations, all new MEP systems, and various sitework at an existing elementary school. The scope also includes a small building addition. Bids will be received for the following work: general building construction, mechanical construction, plumbing construction, electrical construction, food service construction, roofing construction.
Posted Date
Jan 3, 2026
Due Date
Feb 5, 2026
Release: Jan 3, 2026
Close: Feb 5, 2026
Project consists of interior architectural renovations, all new MEP systems, and various sitework at an existing elementary school. The scope also includes a small building addition. Bids will be received for the following work: general building construction, mechanical construction, plumbing construction, electrical construction, food service construction, roofing construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →