Open RFP

Request for Proposals City of Harrisburg Schools GSI Projects

Description: Capital Region Water (CRW) is seeking proposals from qualified professional consultant firms with expertise in Green Stormwater Infrastructure (GSI) Stormwater Control Measures (SCMs). The professional consultant must have the ability to handle urban GSI SCM design, specifically within the City of Harrisburg, PA. As part of Capital Region Water’s City Beautiful H2O Program Plan and Alternative Analysis Report (March 2024), the Lower Paxton Creek Planning Area was identified as a strategic GSI implementation area to support the reduction of Combined Sewer Overflows. CRW seeks qualified professionals with planning and designing GSI improvements at three sites within the Lower Paxton Creek Planning Area. While the term "proposal" is used interchangeably with "qualifications package", the materials requested from respondents are of a more general nature, consistent with qualifications. A detailed scope of work and fee proposal will be required from selected firms once specific assignments are issued following this procurement process.  CRW’s selection process will be based on a best-value approach, prioritizing the consultant’s technical expertise, innovation, and ability to manage complex schedule and stakeholder coordination. While qualifications and experience will be the primary evaluation factors, cost will also be considered to ensure that the selected consultant provides the most effective solution within CRW’s budget. As part of Capital Region Water’s City Beautiful H2O Program Plan and Alternative Analysis Report (March 2024), the Lower Paxton Creek Planning Area was identified as a strategic GSI implementation area to support the reduction of Combined Sewer Overflows. CRW seeks qualified professionals with planning and designing GSI improvements at three sites within the Lower Paxton Creek Planning Area, specifically within the CSO Outfall 48 sewer shed. The selected consultant will produce final GSI SCM design for projects at Melrose, Rowland Intermediate, and Scott Elementary Schools to manage runoff generated from the public right-of-way and adjacent drainage areas with surface and subsurface stormwater management features located on, or adjacent to, the school sites. Concepts that were identified through initial planning and feasibility evaluation will be advanced to preparation of construction documents. These documents include the design of stormwater conveyance systems to collect runoff and the design of GSI SCM systems. Consultant will perform quality control reviews throughout the project to minimize potential schedule delays and to deliver a complete and constructible design package at the conclusion of the project.

Buyer
Capital Region Water

SpecialDistrict · PA, US

Released
Nov 17, 2026
Closes
Dec 16, 2026(19 days left)
See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts