Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Proposals are sought for the assessment of physical conditioning of defined properties, including mechanical, electrical, plumbing, life safety systems, and building exteriors, to develop an Enterprise Risk Management Program.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Provision of the assessment of physical conditioning of defined properties including mechanical, electrical, and plumbing systems, life safety systems, and building exterior.
Posted Date
Dec 26, 2025
Due Date
Jan 13, 2026
Release: Dec 26, 2025
Close: Jan 13, 2026
Provision of the assessment of physical conditioning of defined properties including mechanical, electrical, and plumbing systems, life safety systems, and building exterior.
AvailablePerform a comprehensive facility condition assessment (FCA) of eight warehouses located at the Big Pasco Industrial Center (BPIC). Assessments will inform the port's capital planning and maintenance strategies, providing a clear roadmap for the long-term viability of critical assets including: Mechanical systems; structural integrity; electrical systems; plumbing; HVAC and heating; ventilation systems; fire suppression; building envelope; roofing; and foundation.
Posted Date
Dec 17, 2025
Due Date
Jan 30, 2026
Release: Dec 17, 2025
Close: Jan 30, 2026
Perform a comprehensive facility condition assessment (FCA) of eight warehouses located at the Big Pasco Industrial Center (BPIC). Assessments will inform the port's capital planning and maintenance strategies, providing a clear roadmap for the long-term viability of critical assets including: Mechanical systems; structural integrity; electrical systems; plumbing; HVAC and heating; ventilation systems; fire suppression; building envelope; roofing; and foundation.
AvailableSeeking qualified firms or consultants to conduct a comprehensive fire station building condition assessment and station location study. Evaluate the six fire stations for: condition assessment narrative; structural integrity and building envelope condition; hvac, plumbing, electrical, and mechanical systems; code and ada compliance; service life and sustainability; deferred maintenance and life cycle costs; space utilization, ergonomics, and operational functionality; service life of operational equipment (doors, windows, paint, sidewalks, concrete, brick work, retaining walls, etc. ); assessment of maintenance approach compared to new construction estimates. See outside link.
Posted Date
Dec 1, 2025
Due Date
Feb 5, 2026
Release: Dec 1, 2025
Close: Feb 5, 2026
Seeking qualified firms or consultants to conduct a comprehensive fire station building condition assessment and station location study. Evaluate the six fire stations for: condition assessment narrative; structural integrity and building envelope condition; hvac, plumbing, electrical, and mechanical systems; code and ada compliance; service life and sustainability; deferred maintenance and life cycle costs; space utilization, ergonomics, and operational functionality; service life of operational equipment (doors, windows, paint, sidewalks, concrete, brick work, retaining walls, etc. ); assessment of maintenance approach compared to new construction estimates. See outside link.
AvailableWork includes general interior and exterior renovations of a 1,773 sf adobe stucco building, electrical system upgrades, rewiring, and panel improvements, plumbing fixture replacement, piping modifications, and code compliance updates, HVAC installation, replacement, or major service, including ductwork and controls.
Posted Date
Dec 24, 2025
Due Date
Jan 16, 2026
Release: Dec 24, 2025
Close: Jan 16, 2026
Work includes general interior and exterior renovations of a 1,773 sf adobe stucco building, electrical system upgrades, rewiring, and panel improvements, plumbing fixture replacement, piping modifications, and code compliance updates, HVAC installation, replacement, or major service, including ductwork and controls.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis