Closing soonRequest for Letters of Interest for SR 534/SR 417 Ramp Realignment – Segment 1A [Project No. 534-240] SR 534/417 Systems & Service Interchanges - SEG. 1 [Project No. 534-241]
Description: NOTICE IS HEREBY GIVEN that the Central Florida Expressway Authority, henceforth referred to as the CFX is accepting sealed offers for:
Request for Letters of Interest for SR 534/SR 417 Ramp Realignment – Segment 1A [Project No. 534-240] SR 534/417 Systems & Service Interchanges - SEG. 1 [Project No. 534-241]
Project Summary: Central Florida Expressway Authority requires the services of a Professional Engineering Consultant to provide CEI services related to the construction of SR 534 Segment 1 - SR 534/SR417 Interchange (534-241) and Segment 1A SR 417 SB Ramp Extensions (534-240).
534-241 consists of the construction of SR 534 from SR 417 to north of Laureate Boulevard. This project includes a four-lane limited access expressway and systems interchange with SR 417 and a service interchange with Medical City Drive within the systems interchange. The project also includes new bridges for multiple interchange ramps, Medical City Drive over SR 417, SR 534 over Lake Nona Boulevard (south of the SR 417 alignment), multiple bridge widenings including Lake Nona Boulevard over SR 417 and OUC, and All Electronic Tolling (AET) gantries for ramps. The project includes reconstruction of the SR 417 interchange ramps with Boggy Creek Road, Jeff Fuqua Boulevard, and Lake Nona Boulevard as well as improvements along Lake Nona Boulevard from south of Nemours Parkway to the north of OUC railroad.
534-240 consist of the construction of the SR 417 southbound ramp extension from Boggy Creek Road to Landstar Blvd. This project includes the realignment and combination of entrance ramps from Boggy Creek Road and South Access Rd into a single ramp entering SR 417 southbound and the addition of a fourth lane from the entrance ramp to Landstar Blvd. This project also includes the demolition of the existing Boggy Creek Mainline Plaza and replacement with an AET gantry, widening of the SR 417 SB bridge over Rhode Island Woods Circle, and the realignment of the SR 417 SB exit to Landstar Blvd.
Additional project elements include, but are not limited to, Utility Work by Highway Contractor (UWHC), intelligent transportation systems (ITS), lighting, signing and pavement markings, tolling, maintenance of traffic, noise walls, and utility coordination.
The FY 27-31 Work Plan estimated construction cost is $527 million.
Sealed offers for furnishing the above will be accepted up to Friday, November 20, 2026 1:30 pm.
NOTE: Respondents are required to submit responses electronically via the OpenGov e-Procurement Platform. Respondents shall not be permitted to hand-deliver, mail, telephone, fax or email offers. Responses received after the submission deadline and/or transmitted outside of the designated OpenGov e-Procurement Platform shall be rejected.
Important Instructions for Electronic Submittal
CFX is ONLY accepting electronic submissions using the OpenGov e-Procurement Platform. Respondents shall create a FREE account with OpenGov by signing up at https://procurement.opengov.com/login . Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic offer.
It is the respondent's responsibility to ensure they commence their upload efforts timely to meet the submission deadline. CFX shall not be responsible for delays caused by any occurrence, including the respondent's network delays, bandwidth issues, internet outages, or technical difficulties.
OpenGov Technical Support
For Technical Support, respondent's can reach the OpenGov Service Desk:
Live Chat: Click the blue chat button on the lower right, hours: Mon-Fri 7am - 10pm EST
Email: procurement-support@opengov.com
Phone: 1 (650) 336-7167, hours: Mon-Fri 7am - 10pm EST
The Central Florida Expressway Authority (CFX) is an independent agency of the State of Florida that operates and maintains a regional network of expressways for 3.5 million residents of Brevard, Lake, Orange, Osceola, and Seminole counties and more than 75 million annual visitors to Central Florida. CFX’s 125-centerline mile, user-funded system includes 73 interchanges, 14 mainline toll plazas, 5 mainline gantries, 76 ramp toll plazas and 369 bridges. On average, more than 1.6 million toll transactions are recorded daily with all of them electronically. CFX operates E-PASS, the first electronic toll collection system in Florida, with more than one million E-PASS accounts. CFX operates in Central Florida with a staff committed to excellence, innovation, service and teamwork.