Retrieving RFP details
Release
Close
Hamilton County
Replacement plans for bridge #125 atlantic rd over stony creek.
Holmes County
Work includes bridge replacement.
Montgomery County
The work will consist of the following: a.Relocate the existing water and sewer utilities below Mill Creek per the WSSC plans. b.Install 12” casing pipe below Mill Creek per the Washington Gas plans. c. Removal of the existing 27’-8” +/- wide concrete bridge. d. Install a new, 48’-0” wide bridge comprised of precast non voided, concrete slabs, abutments, and wing walls. e. Mill and resurface 215 LF of the existing roadway. f. Full depth pavement reconstruction for 50 LF (g) 363 LF of W-beam traffic barrier with anchorage to the proposed bridge structure and three (3) Type C end treatments. (h) 112 LF of Type A combination curb and gutter. (i) One (1) Type E combination inlet. (j) Installation of 15.9 LF 15” RCP storm drain pipe. (k) Stream restoration along approximately 375 LF of Mill Creek as shown on theplans.(l) Tree planting as shown on the plans. (m) Installation of pavement markings and signs.
Clarke County
Work includes construction of 2 40 LF, 1 110 lf, 1 40 LF prestressed concrete beam span bridge, grade, drain, and pave 0.184 miles of bridge approaches.
Release
-
Close
Nov 24, 2025