Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
This invitation to bid is for the replacement of the Round Lake Road Bridge over Long Lake Outlet.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Release: Dec 16, 2025
Close: Jan 20, 2026
Work includes bridge replacement.
AvailablePlumas County seeks qualified firms for construction phase engineering services for the Snake Lake Road Bridge Replacement Project. Services include contract administration, inspection, and material testing for a new two-lane bridge. The project involves replacing a structurally deficient bridge with a precast concrete structure, requiring dewatering and temporary detour bridge installation.
Posted Date
Oct 28, 2025
Due Date
Jan 16, 2026
Release: Oct 28, 2025
Close: Jan 16, 2026
Plumas County seeks qualified firms for construction phase engineering services for the Snake Lake Road Bridge Replacement Project. Services include contract administration, inspection, and material testing for a new two-lane bridge. The project involves replacing a structurally deficient bridge with a precast concrete structure, requiring dewatering and temporary detour bridge installation.
AvailableWork includes replacement of the wiler road bridge with a new buried precast concrete structure.
Posted Date
Nov 14, 2025
Due Date
Jan 7, 2026
Release: Nov 14, 2025
Close: Jan 7, 2026
Work includes replacement of the wiler road bridge with a new buried precast concrete structure.
AvailableWork includes the Westside Road bridge replacement and approach roadway. Major work includes, but is not limited to: 1. Removal of the existing bridge in stages 2. Construction of a new bridge to be completed over two construction seasons 3. Road construction work 4. Sidewalks, curb and gutter 5. Traffic control and traffic handling 6. Utility coordination, relocations and installation 7. Storm water pollution control.
Posted Date
Nov 20, 2025
Due Date
Jan 22, 2026
Release: Nov 20, 2025
Close: Jan 22, 2026
Work includes the Westside Road bridge replacement and approach roadway. Major work includes, but is not limited to: 1. Removal of the existing bridge in stages 2. Construction of a new bridge to be completed over two construction seasons 3. Road construction work 4. Sidewalks, curb and gutter 5. Traffic control and traffic handling 6. Utility coordination, relocations and installation 7. Storm water pollution control.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis