Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Procurement of services to remove and replace four air conditioning units and integrate them into the existing chilled water infrastructure in the Data Center at the Las Vegas Convention Center.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Remove and replace four air conditioning units and tie into the existing chilled water infrastructure in the data center.
Posted Date
Jan 12, 2026
Due Date
Feb 3, 2026
Release: Jan 12, 2026
Close: Feb 3, 2026
Remove and replace four air conditioning units and tie into the existing chilled water infrastructure in the data center.
AvailableReplacement AC Package Units. The Contractor shall provide all labor, materials, tools, equipment, supplies, and supervision for the replacement and repair of HVAC units.
Posted Date
Jan 14, 2026
Due Date
Feb 27, 2026
Release: Jan 14, 2026
Close: Feb 27, 2026
Replacement AC Package Units. The Contractor shall provide all labor, materials, tools, equipment, supplies, and supervision for the replacement and repair of HVAC units.
AvailableThe Project Base Scope generally consists of approx. the replacement of two A/C cooling units in the network racks in the Data Center, and their two corresponding rooftop condenser units, one complete system at a time, and any other work as described in the Project Documents. See attached and outside link file for more details.
Posted Date
Jan 14, 2026
Due Date
Jan 30, 2026
Release: Jan 14, 2026
Close: Jan 30, 2026
The Project Base Scope generally consists of approx. the replacement of two A/C cooling units in the network racks in the Data Center, and their two corresponding rooftop condenser units, one complete system at a time, and any other work as described in the Project Documents. See attached and outside link file for more details.
AvailableProvide disposal of surplus property. Items up for bid include: 17 230 volt window units. They are heat/AC. These units are 16000-18000 BTU.
Posted Date
Jan 8, 2026
Due Date
Feb 4, 2026
Release: Jan 8, 2026
Close: Feb 4, 2026
Provide disposal of surplus property. Items up for bid include: 17 230 volt window units. They are heat/AC. These units are 16000-18000 BTU.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis