Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include removal of existing ups system and all components. The removal of existing pull boxes and installing wires in conduit. The sealing of existing ups room floor as specified in contract. Installation of new ups system with batteries installed by manufacturer and all costs, all ups components, including raceways, conductors, boxes, and all basic materials and labor.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Power supply, uninterruptible, NSN: 6130016018069, P/N: FA00001.
Posted Date
Dec 15, 2025
Due Date
Jan 9, 2026
Release: Dec 15, 2025
Close: Jan 9, 2026
Power supply, uninterruptible, NSN: 6130016018069, P/N: FA00001.
Provide replacement of uninterruptible power supply (UPS) for the plantwide scada system and onsite switches.
Posted Date
Dec 29, 2025
Due Date
Jan 13, 2026
Release: Dec 29, 2025
Close: Jan 13, 2026
Provide replacement of uninterruptible power supply (UPS) for the plantwide scada system and onsite switches.
AvailableUninterruptible Power Supply (UPS) - Battery Backup (E-Rate).
Posted Date
Dec 4, 2025
Due Date
Jan 27, 2026
Release: Dec 4, 2025
Close: Jan 27, 2026
Uninterruptible Power Supply (UPS) - Battery Backup (E-Rate).
AvailableMARTA is seeking bids from Firms to install a dual-feed uninterruptible power supply (UPS) system to enhance the reliability, resiliency, and efficiency of its critical power infrastructure.
Posted Date
Dec 23, 2025
Due Date
Jan 20, 2026
Release: Dec 23, 2025
Close: Jan 20, 2026
MARTA is seeking bids from Firms to install a dual-feed uninterruptible power supply (UPS) system to enhance the reliability, resiliency, and efficiency of its critical power infrastructure.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis