Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project includes demolition of existing service equipment and installation of new service components as outlined below. Remove and dispose of the existing 800-amp electrical service and associated service entrance conductors. Furnish and install a new 600-amp main breaker (MB) panelboard. Reconnect all existing branch circuits currently fed from the existing switchgear into the new panelboard. Furnish and install new 350 MCM copper conductors in existing riser conduits to serve the new 600-amp panelboard. Furnish and install a new panel interior, breakers, and cover for an existing 200-amp panel located in the gymnasium.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Procurement of subcontractors for the APS Switchgear Bundle project at Brandon Elementary School, including electrical work, metal studs, drywall, acoustical ceilings, and insulation.
Posted Date
-
Due Date
Feb 3, 2026
Close: Feb 3, 2026
Procurement of subcontractors for the APS Switchgear Bundle project at Brandon Elementary School, including electrical work, metal studs, drywall, acoustical ceilings, and insulation.
This RFP is for electrical switchgear testing and partial discharge testing services.
Posted Date
Jan 8, 2026
Due Date
Feb 26, 2026
Release: Jan 8, 2026
Close: Feb 26, 2026
This RFP is for electrical switchgear testing and partial discharge testing services.
AvailableProvision of electrical switchgear inspection, testing, maintenance, and partial discharge testing. Arc flash safety training and portable generator connection training. See attached file.
Posted Date
Jan 9, 2026
Due Date
Feb 26, 2026
Release: Jan 9, 2026
Close: Feb 26, 2026
Provision of electrical switchgear inspection, testing, maintenance, and partial discharge testing. Arc flash safety training and portable generator connection training. See attached file.
AvailableThe Work includes new bleachers to replace existing, new doors and frames to replace existing, and modernization of restrooms in existing gymnasium building. There is an alternate bid to demo and replace existing gymnasium wood flooring system.
Posted Date
Jan 21, 2026
Due Date
Feb 18, 2026
Release: Jan 21, 2026
Close: Feb 18, 2026
The Work includes new bleachers to replace existing, new doors and frames to replace existing, and modernization of restrooms in existing gymnasium building. There is an alternate bid to demo and replace existing gymnasium wood flooring system.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis