FederalMA
Aug 26, 2026
Closes
Sep 1, 2026
USCG Station New Heave Floor Replacement RFP
The Contractor shall provide all labor, supervision, materials, equipment, tools, transportation, disposal, protection, coordination, and incidentals necessary to complete the flooring replacement at USCG Station New Haven. Work shall be performed in accordance with manufacturer instructions, applicable codes, OSHA requirements, and Coast Guard facility standards. Work Areas: The project includes removal and replacement of existing flooring throughout approximately 1,777 square feet of designated space, including: Conference room; Hallways and circulation areas; Command Center; Three (3) offices; Three (3) berthing rooms; Kitchen area; Main entrance and side kitchen entrance mat locations. See attached file.