FederalDC
Aug 3, 2026
Closes
Aug 26, 2026
Replace HVAC Units at Building 7 and 97, USCG Base Elizabeth City
The Contractor shall demo the existing fifteen (15) ton split HVAC equipment. The Contractor shall remove the outdoor condensing unit, refrigerant lines, electrical connections, and all other components associated. The Contractor shall repair all holes on the outside of the building to include all penetrations. The Contractor shall remove and reinstall the drop ceiling on the inside of the ballroom area. The Contractor shall remove the existing indoor air handler above the ceiling, refrigerant lines, electrical connections, electrical disconnect, condensate pan, condensate lines, platform, threaded rod, channel strut, and all other components associated. See attached file.