FederalOH
Posted
Aug 3, 2026
Oct 29, 2026
Pulsetech NSNs CL26212001 *SOLE SOURCE*
3 ea, clamp,cable,electri, NSN: 5935015480928; 3 ea, connector assembly, NSN: 5935016458488; 3 ea, solenoid,electrical, NSN: 5945015480933 . See attached file.
Description: This pre-solicitation notice announces the Air Force Sustainment Center’s intent to award Elbit America, Inc. a sole-source IDIQ contract to repair 25 National Stock Numbers supporting F-16 and A-10 aircraft. The work includes diagnostics, testing, and repair of Line Replaceable Units and Shop Replaceable Units, with the contractor supplying the necessary parts, labor, facilities, and engineering support. The proposed contract has a five-year base period and five one-year options, and the notice cites Elbit’s proprietary technical data, software, and test equipment as the basis for the sole-source approach.
Federal · OK, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
FederalOH
Posted
Aug 3, 2026
Oct 29, 2026
3 ea, clamp,cable,electri, NSN: 5935015480928; 3 ea, connector assembly, NSN: 5935016458488; 3 ea, solenoid,electrical, NSN: 5945015480933 . See attached file.
FederalOK
Posted
Sep 28, 2026
Oct 16, 2026
The procurement of: Noun: F-16 Landing Gear, Antilock Brake Sensor, National Stock Number (NSN): 1630015253372LE.
Fire DepartmentNM
Posted
Sep 29, 2026
Oct 29, 2026
Provide Rogers Corporation Dielectric Material.
Posted
Oct 1, 2026
Oct 16, 2026
The contractor shall provide all labor, materials, supplies, equipment, supervision, and other resources necessary to investigate and repair compromised high-density polyethylene (HDPE) piping associated with the existing geothermal loop system. The work is anticipated to include removal of sections of existing parking-lot concrete; excavation to expose geothermal-loop supply and return piping; troubleshooting and identification of compromised piping; repair of geothermal ground-source piping; flushing, cleaning, purging, inspection, and testing of the geothermal network; backfilling of excavated areas; replacement and finishing of concrete; and final operational testing of the geothermal system. See attached file.