FederalOH
-
Closes
Sep 21, 2026
Demo B1067; MacDill AFB, FL RFP
Project consists of but not limited to demolition of building 1067.
Description: Work includes the replacement of the existing chiller along with various hydronic components and incidental related work.
Federal · OH, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
FederalOH
-
Closes
Sep 21, 2026
Project consists of but not limited to demolition of building 1067.
FederalOH
-
Closes
Sep 30, 2026
Provide, install, maintain, relocate, and remove temporary taxi lines and lighted barricades in accordance with the final negotiated phasing and maintenance of airfield traffic plans. Eliminate the possibility of foreign object damage (fod) by sweeping during all work periods and when directed by airfield management, all areas traversed by or under the influence of contractor’s work and equipment. Provide engineer of record (eor) services to create a signed and sealed issued for construction (100%) drawing and specification set based on the 35% bid documents, intervening government review comments, and the whole building design guidance, unified facilities criteria (ufc) and the unified facilities guide specification (ufgs). Mill and overlay-pave taxiway echo, golf, and lima. Prior to overlay paving inspect the milled surface and report to the government the extent and severity of visible cracks on the milled surface. Perform crack sealing of visible cracks on the milled surface as directed by the government. Install a geotextile, crack control fabric, pavement interlayer within taxiway lima overlay pavement. Remove, store and protect, as well as re-install after overlay paving taxiway golf and lima asphalt shoulder in-pavement lighting. Cover and protect in-pavement lighting bases. Provide location services and coring of overlay pavement as required to re-install lighting. This effort to be segmented and executed in accordance with the final negotiated phasing plan. Provide, maintain and remove airfield lighting circuiting as required to preserve the functionality of all in-pavement lighting to remain in place. This effort to be segmented and executed in accordance with the final negotiated phasing plan. Mill and overlay-pave taxiway golf and lima asphalt shoulders. Fog seal taxiway echo asphalt shoulders. Remove airfield pavement markings within taxiway echo asphalt shoulders, as well as beyond the limit of project paving and sealing as required to facilitate the final negotiated airfield marking plan. Remark airfield surfaces in accordance with the final negotiated airfield marking plan.
State AgencyFL
-
Closes
Sep 21, 2026
The work includes removing and replacing the fire alarm systems for buildings 359 and 529 and installing new fire alarm mass notification systems and incidental related work.
State AgencyFL
Jun 6, 2026
Closes
Aug 27, 2026
Work includes mill and overlay of one pavement and incidental related work.
Procurement and program contacts connected to Air Force Materiel Command.