The SESP Renovation Phases F, G, H, I Project construction includes renovation of the interior of the SESP building (approx.28,000 SF) and must be completed prior to the Occupancy of the upcoming Replacement Hospital Tower (RHT) project (separate project). Construction in the SESP includes but is not limited to: Phase F - 1st floor Emergency Department remodel - Build out of treatment rooms and associated Nurse Station, Dictation, Consult Rooms, Storage, etc. 2nd floor - Provide access to Men's Surgery Support Locker Room by adding ramps, landing and door opening, minor reconfiguration of lockers. Phase G - 1st Floor - Reconfigure existing Pediatric ED Resuscitation, Consult, Sub Waiting, Storage, Soiled Utility, and House Keeping. Add additional Patient Toilet Room. Phase H - Basement - Demo On-Call Sleep Rooms to Expand Corridor and add Staff Toilet Room to support On Call. In Existing CPU - Convert Non Sterile Receiving to Staff Work Room. Convert Existing Storage Room to Vendor Drop Off, Staff Work Room, & POM Maintenance Space. Reconfigure Men's and Women's Locker & Shower rooms by expanding into adjacent office space. Phase I - Basement - Reconfigure Receiving/Breakdown, Surgical Supply, Scope Storage, and Staff Restrooms to expand Surgical Supply into the Existing CPU Staging area and widen the adjacent corridor. Reconfigure the existing Lift Team area, Staff lounge and Locker Room to widen the adjacent corridor and provide expanded locker area. Reconfigure Existing Cart Washer for new equipment, add exhaust fan and duct to roof. Work in this bid package includes design-build services for the Fire Protection scope for the SESP Renovation Phases F, G, H & I Project. All work in this bid package must comply with the UCDH RHT Project Labor Agreement (PLA). All work included in this bid package will be performed under the authority and jurisdiction of HCAi. The SESP Renovation Phases F, G, H & I project.
Available