Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The SESP Renovation Phases F, G, H, I Project construction includes renovation of the interior of the SESP building (approx.28,000 SF) and must be completed prior to the Occupancy of the upcoming Replacement Hospital Tower (RHT) project (separate project). Construction in the SESP includes but is not limited to: Phase F - 1st floor Emergency Department remodel - Build out of treatment rooms and associated Nurse Station, Dictation, Consult Rooms, Storage, etc. 2nd floor - Provide access to Men's Surgery Support Locker Room by adding ramps, landing and door opening, minor reconfiguration of lockers. Phase G - 1st Floor - Reconfigure existing Pediatric ED Resuscitation, Consult, Sub Waiting, Storage, Soiled Utility, and House Keeping. Add additional Patient Toilet Room. Phase H - Basement - Demo On-Call Sleep Rooms to Expand Corridor and add Staff Toilet Room to support On Call. In Existing CPU - Convert Non Sterile Receiving to Staff Work Room. Convert Existing Storage Room to Vendor Drop Off, Staff Work Room, & POM Maintenance Space. Reconfigure Men's and Women's Locker & Shower rooms by expanding into adjacent office space. Phase I - Basement - Reconfigure Receiving/Breakdown, Surgical Supply, Scope Storage, and Staff Restrooms to expand Surgical Supply into the Existing CPU Staging area and widen the adjacent corridor. Reconfigure the existing Lift Team area, Staff lounge and Locker Room to widen the adjacent corridor and provide expanded locker area. Reconfigure Existing Cart Washer for new equipment, add exhaust fan and duct to roof. Work in this bid package includes design-build services for the Fire Protection scope for the SESP Renovation Phases F, G, H & I Project. All work in this bid package must comply with the UCDH RHT Project Labor Agreement (PLA). All work included in this bid package will be performed under the authority and jurisdiction of HCAi. The SESP Renovation Phases F, G, H & I project.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The project generally consists of the demolition of a 40' tall telecommunications tower that will be replaced with a new 80' tall self-supporting tower structure. Completely design, fabricate, and erect an 80' self-supporting communications tower (including all appurtenances). The scope of work also includes Prep and paint existing communication shelter, Site clearing, grading, backfill. Construct mat slab foundation for new tower. Demolish and install new chain link fencing around site perimeter, Site grounding, see outside link.
Posted Date
Jan 23, 2026
Due Date
Feb 26, 2026
Release: Jan 23, 2026
Close: Feb 26, 2026
The project generally consists of the demolition of a 40' tall telecommunications tower that will be replaced with a new 80' tall self-supporting tower structure. Completely design, fabricate, and erect an 80' self-supporting communications tower (including all appurtenances). The scope of work also includes Prep and paint existing communication shelter, Site clearing, grading, backfill. Construct mat slab foundation for new tower. Demolish and install new chain link fencing around site perimeter, Site grounding, see outside link.
AvailableThe City of San Bernardino Municipal Water Department (SBMWD) issued an RFP to inspect, clean, rehabilitate, and replace internal packing media and associated components for the Waterman Tower (South), a fiberglass air-stripping tower used in the Department's VOC removal system. The solicitation requires electronic bid submission via the buyer's bid-management system, includes minimum experience and public-works registration requirements, and estimates the project value at approximately $500,000–$1,500,000. Bids are due on 2026-02-27 and a pre-bid conference is indicated.
Posted Date
Jan 27, 2026
Due Date
Feb 27, 2026
Release: Jan 27, 2026
Close: Feb 27, 2026
The City of San Bernardino Municipal Water Department (SBMWD) issued an RFP to inspect, clean, rehabilitate, and replace internal packing media and associated components for the Waterman Tower (South), a fiberglass air-stripping tower used in the Department's VOC removal system. The solicitation requires electronic bid submission via the buyer's bid-management system, includes minimum experience and public-works registration requirements, and estimates the project value at approximately $500,000–$1,500,000. Bids are due on 2026-02-27 and a pre-bid conference is indicated.
Release: Jan 18, 2026
Close: Feb 26, 2026
Project-based vouchers.
AvailableRelease: Jan 18, 2026
Close: Feb 26, 2026
Project-based vouchers.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis