Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The project generally consists of the demolition of a 40' tall telecommunications tower that will be replaced with a new 80' tall self-supporting tower structure. Completely design, fabricate, and erect an 80' self-supporting communications tower (including all appurtenances). The scope of work also includes Prep and paint existing communication shelter, Site clearing, grading, backfill. Construct mat slab foundation for new tower. Demolish and install new chain link fencing around site perimeter, Site grounding, see outside link.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of San Bernardino Municipal Water Department (SBMWD) issued an RFP to inspect, clean, rehabilitate, and replace internal packing media and associated components for the Waterman Tower (South), a fiberglass air-stripping tower used in the Department's VOC removal system. The solicitation requires electronic bid submission via the buyer's bid-management system, includes minimum experience and public-works registration requirements, and estimates the project value at approximately $500,000–$1,500,000. Bids are due on 2026-02-27 and a pre-bid conference is indicated.
Posted Date
Jan 27, 2026
Due Date
Feb 27, 2026
Release: Jan 27, 2026
Close: Feb 27, 2026
The City of San Bernardino Municipal Water Department (SBMWD) issued an RFP to inspect, clean, rehabilitate, and replace internal packing media and associated components for the Waterman Tower (South), a fiberglass air-stripping tower used in the Department's VOC removal system. The solicitation requires electronic bid submission via the buyer's bid-management system, includes minimum experience and public-works registration requirements, and estimates the project value at approximately $500,000–$1,500,000. Bids are due on 2026-02-27 and a pre-bid conference is indicated.
AvailableContractor shall provide the following services: Repairing any issues and rainwater leaks from the existing cooling tower exhaust ductwork and include a section just above the cooling tower with watertight accessible inspection/maintenance doors; Removal, disposal, and replacement of the damper and all necessary mechanical components to operate except for the existing Belimo actuator; and Replacing the existing flasher with a new one.
Posted Date
Feb 3, 2026
Due Date
Feb 27, 2026
Release: Feb 3, 2026
Close: Feb 27, 2026
Contractor shall provide the following services: Repairing any issues and rainwater leaks from the existing cooling tower exhaust ductwork and include a section just above the cooling tower with watertight accessible inspection/maintenance doors; Removal, disposal, and replacement of the damper and all necessary mechanical components to operate except for the existing Belimo actuator; and Replacing the existing flasher with a new one.
Replacement of existing cooling tower with cooling tower of same design capacity and similar footprint.
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Close: Feb 11, 2026
Replacement of existing cooling tower with cooling tower of same design capacity and similar footprint.
AvailableWork includes mechanical equipment replacement project involving cooling tower and sump tank replacement and removal and installation of hvac equipment.
Posted Date
Jan 29, 2026
Due Date
Mar 10, 2026
Release: Jan 29, 2026
Close: Mar 10, 2026
Work includes mechanical equipment replacement project involving cooling tower and sump tank replacement and removal and installation of hvac equipment.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis