Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Renovation of the Administration Building - Phase II. General Construction; HVAC Construction; Electrical Construction.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work include remove existing roof system and all components, disposal of existing roof system, add tapered panels as needed to roof structure to slope roof for proper drainage, install 2 layers of Poly-Iso insulation (R-30) over entire roof, flash and or fabricate all HVAC curbs, skylights, drains and penetrations, install new 60 mil tpo membrane roof system over Poly-Iso insulation, install steel cap on top of parapet walls to install continuous hold down cleat.
Posted Date
Nov 21, 2025
Due Date
Dec 20, 2025
Release: Nov 21, 2025
Close: Dec 20, 2025
Work include remove existing roof system and all components, disposal of existing roof system, add tapered panels as needed to roof structure to slope roof for proper drainage, install 2 layers of Poly-Iso insulation (R-30) over entire roof, flash and or fabricate all HVAC curbs, skylights, drains and penetrations, install new 60 mil tpo membrane roof system over Poly-Iso insulation, install steel cap on top of parapet walls to install continuous hold down cleat.
Premium
Access the largest public sector contact database
Provide selective demolition, hvac, electrical, plumbing, construction of administrative space, suspended-slab-on-metal deck interior loading dock repair, and various finishes. The work area is approx 2,500 SF.
Posted Date
Dec 2, 2025
Due Date
Jan 9, 2026
Release: Dec 2, 2025
Close: Jan 9, 2026
Provide selective demolition, hvac, electrical, plumbing, construction of administrative space, suspended-slab-on-metal deck interior loading dock repair, and various finishes. The work area is approx 2,500 SF.
AvailableProvide 2026 phase ii capital improvements.
Posted Date
Nov 26, 2025
Due Date
Dec 23, 2025
Release: Nov 26, 2025
Close: Dec 23, 2025
Provide 2026 phase ii capital improvements.
AvailableWork includes school phase II construction.
Posted Date
-
Due Date
Jan 6, 2026
Release: -
Close: Jan 6, 2026
Work includes school phase II construction.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis