Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Remove & repave recreation courts, main building.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Vendor to mill and remove approximately 4-6" of existing asphalt/concrete from visitor parking lot (parking lot on west side of Main Building). Vendor to remove grass and concrete curb around existing fire hydrant. Vendor to install bollards around existing fire hydrant compliant with appropriate codes. Vendor to repave parking lot using bituminous asphalt utilizing existing curb, gutter, manholes, etc. The contract will have an initial term commencing upon the last dated signature of the Parties and ending on 06/30/2026.
Posted Date
Dec 16, 2025
Due Date
Jan 2, 2026
Release: Dec 16, 2025
Close: Jan 2, 2026
Vendor to mill and remove approximately 4-6" of existing asphalt/concrete from visitor parking lot (parking lot on west side of Main Building). Vendor to remove grass and concrete curb around existing fire hydrant. Vendor to install bollards around existing fire hydrant compliant with appropriate codes. Vendor to repave parking lot using bituminous asphalt utilizing existing curb, gutter, manholes, etc. The contract will have an initial term commencing upon the last dated signature of the Parties and ending on 06/30/2026.
Premium
Access the largest public sector contact database
DESIGN-BUILD services for (1) adaptive re-use renovations for the fairmount park armory building and (2) for fifteen (15) new pickleball courts.
Posted Date
Nov 9, 2025
Due Date
Jan 30, 2026
Release: Nov 9, 2025
Close: Jan 30, 2026
DESIGN-BUILD services for (1) adaptive re-use renovations for the fairmount park armory building and (2) for fifteen (15) new pickleball courts.
AvailableBidders must: mill and remove approximately 6 inches of existing asphalt from parking lot. Ensure base under asphalt is smooth with proper slope for drainage. Repave using bituminous asphalt utilizing existing curb, gutter, manholes, etc. The contract will have an initial term commencing upon last dated signature of both parties through June 30, 2026.
Posted Date
Dec 5, 2025
Due Date
Dec 22, 2025
Release: Dec 5, 2025
Close: Dec 22, 2025
Bidders must: mill and remove approximately 6 inches of existing asphalt from parking lot. Ensure base under asphalt is smooth with proper slope for drainage. Repave using bituminous asphalt utilizing existing curb, gutter, manholes, etc. The contract will have an initial term commencing upon last dated signature of both parties through June 30, 2026.
AvailableWork consists of removal of asphalt overlaid concrete pavement, concrete curbs, storm drainage structures and pipe, and portions of concrete sidewalk. Temporarily remove a USPS Mail Drop Box; installation of new storm drainage structures and pipe; construct HMA pavement, concrete curbs, concrete drop curbs, and concrete sidewalk; construct porous concrete motorcycle parking area consisting of pre-cast porous concrete slabs; segmental block retaining walls, and underdrain pipe system; apply pavement markings as shown on drawings; and re-install existing USPS Mail Drop Box in location identified on plans.
Posted Date
Oct 31, 2025
Due Date
Jan 6, 2026
Release: Oct 31, 2025
Close: Jan 6, 2026
Work consists of removal of asphalt overlaid concrete pavement, concrete curbs, storm drainage structures and pipe, and portions of concrete sidewalk. Temporarily remove a USPS Mail Drop Box; installation of new storm drainage structures and pipe; construct HMA pavement, concrete curbs, concrete drop curbs, and concrete sidewalk; construct porous concrete motorcycle parking area consisting of pre-cast porous concrete slabs; segmental block retaining walls, and underdrain pipe system; apply pavement markings as shown on drawings; and re-install existing USPS Mail Drop Box in location identified on plans.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis