Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal of one (1) existing potable water supply well, Well Annex 26, including demolition of above and below ground pipe, valves, fittings, tanks, electrical equipment, and vaults, isolation of the collection main, destruction of the well, backfill and compaction, site restoration, and/or other work
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The City of Long Beach is soliciting contractors to remove one potable water supply well (Well Annex 26), including demolition of above- and below-ground infrastructure, destruction of the well, backfill and compaction, and site restoration per the contract drawings/specifications. Bidders must secure all required permits (DEH, City of Long Beach, Los Angeles Flood Control District, Cal-OSHA) and maintenance of safety and site cleanliness is required. The procurement is an Invitation to Bid issued by the Long Beach Utilities Department (Engineering Bureau) with an optional pre-bid site meeting on 2026-01-14.
Posted Date
Dec 26, 2025
Due Date
Jan 28, 2026
Release: Dec 26, 2025
Close: Jan 28, 2026
The City of Long Beach is soliciting contractors to remove one potable water supply well (Well Annex 26), including demolition of above- and below-ground infrastructure, destruction of the well, backfill and compaction, and site restoration per the contract drawings/specifications. Bidders must secure all required permits (DEH, City of Long Beach, Los Angeles Flood Control District, Cal-OSHA) and maintenance of safety and site cleanliness is required. The procurement is an Invitation to Bid issued by the Long Beach Utilities Department (Engineering Bureau) with an optional pre-bid site meeting on 2026-01-14.
AvailableWork includs drilling of new production well at the dunn valley water campus installation of well casing and fittings, inclusive installation of well pump and appurtenances installation of pitless adapter.
Posted Date
Nov 14, 2025
Due Date
Jan 20, 2026
Release: Nov 14, 2025
Close: Jan 20, 2026
Work includs drilling of new production well at the dunn valley water campus installation of well casing and fittings, inclusive installation of well pump and appurtenances installation of pitless adapter.
AvailableWork include well water tank replacement.
Posted Date
Nov 3, 2025
Due Date
Jan 22, 2026
Release: Nov 3, 2025
Close: Jan 22, 2026
Work include well water tank replacement.
AvailableConstruction of the Northeast Water Reclamation Facility Deep Injection Well Equipping and Conveyance Project.
Posted Date
Dec 29, 2025
Due Date
Feb 12, 2026
Release: Dec 29, 2025
Close: Feb 12, 2026
Construction of the Northeast Water Reclamation Facility Deep Injection Well Equipping and Conveyance Project.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →