Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Removal of curly leaf pond weed. Project length is estimated at 2 days.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
The Work to be performed is sediment removal and restoration of five stormwater ponds includes, but is not limited to: Mobilization of labor, equipment, materials, and temporary facilities; installation of safety measures, establishing limits of staging and construction, and protecting of all existing utilities, trees and structures as specified on the plans; traffic control at and around construction sites; installation of erosion control BMPs in accordance with project SWPPP; control of water and/or dewatering as necessary to perform the Work; pre-construction topographic survey of the five ponds performed by licensed surveyor; clearing, grubbing, and tree removal; removal of accumulated sediment/muck/vegetation from five stormwater ponds; hauling and disposal of sediment/muck/vegetation material to a Municipal Solid Waste (MSW) landfill that can accept non-hazardous contaminated sediment; Furnishing and placement of riprap at pond inlets, outlets, and overflow structures; performance of post-construction topographic survey of the five ponds; clean-up and restoration of all areas directly or indirectly disturbed by the Work to the pre-existing conditions or as specified on the plans; demobilization from the site after work is complete.
Posted Date
Dec 11, 2025
Due Date
Jan 15, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Release: Dec 11, 2025
Close: Jan 15, 2026
The Work to be performed is sediment removal and restoration of five stormwater ponds includes, but is not limited to: Mobilization of labor, equipment, materials, and temporary facilities; installation of safety measures, establishing limits of staging and construction, and protecting of all existing utilities, trees and structures as specified on the plans; traffic control at and around construction sites; installation of erosion control BMPs in accordance with project SWPPP; control of water and/or dewatering as necessary to perform the Work; pre-construction topographic survey of the five ponds performed by licensed surveyor; clearing, grubbing, and tree removal; removal of accumulated sediment/muck/vegetation from five stormwater ponds; hauling and disposal of sediment/muck/vegetation material to a Municipal Solid Waste (MSW) landfill that can accept non-hazardous contaminated sediment; Furnishing and placement of riprap at pond inlets, outlets, and overflow structures; performance of post-construction topographic survey of the five ponds; clean-up and restoration of all areas directly or indirectly disturbed by the Work to the pre-existing conditions or as specified on the plans; demobilization from the site after work is complete.
AvailableSeeking fixed cost bids for the mowing and removal of noxious weeds, primarily Scotchbroom, across 36.5 acres of land in Taholah, including potential hauling of cut material.
Posted Date
-
Due Date
Jan 30, 2026
Close: Jan 30, 2026
Seeking fixed cost bids for the mowing and removal of noxious weeds, primarily Scotchbroom, across 36.5 acres of land in Taholah, including potential hauling of cut material.
AvailableProviding as-needed weed abatement, vegetation management, dead and dying tree removal, and refuse abatement services are invited to submit a statement of qualifications to city of community development department in response to this request for qualifications.
Posted Date
Dec 11, 2025
Due Date
Jan 30, 2026
Release: Dec 11, 2025
Close: Jan 30, 2026
Providing as-needed weed abatement, vegetation management, dead and dying tree removal, and refuse abatement services are invited to submit a statement of qualifications to city of community development department in response to this request for qualifications.
AvailableWork consists of roadside pond cleaning; work includes clearing and grubbing, large vegetation removal, and sodding.
Posted Date
Dec 19, 2025
Due Date
Feb 3, 2026
Release: Dec 19, 2025
Close: Feb 3, 2026
Work consists of roadside pond cleaning; work includes clearing and grubbing, large vegetation removal, and sodding.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →