Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of roadside pond cleaning; work includes clearing and grubbing, large vegetation removal, and sodding.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Roadside mowing.
Posted Date
Dec 12, 2025
Due Date
Jan 15, 2026
Release: Dec 12, 2025
Close: Jan 15, 2026
Roadside mowing.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
RFP for roadside mowing services.
Posted Date
Dec 12, 2025
Due Date
Jan 13, 2026
Release: Dec 12, 2025
Close: Jan 13, 2026
RFP for roadside mowing services.
AvailableWork consists of cleaning and reshaping ditches, rework shoulders and utility strips, tree trimming and removal, power shearing and brush removal on department maintained roadways on an as-needed basis, performance turf, sod SY 5,000.00, clearing & grubbing AC 3.00, clean and reshape ditch (haul) LF 10,000.00, reworking shoulders (spot repairs) SY 4,500.00, reworking utility strips SY 10,000.00, reworking retention pond slopes SY 1,000.00, blading paved shoulder, up to 24" beyond pavement LF 10,560.00, tree removal (4" to 12") EA 125.00, stump removal (less than 4") EA 75.00. See attached file.
Posted Date
Dec 5, 2025
Due Date
Feb 3, 2026
Release: Dec 5, 2025
Close: Feb 3, 2026
Work consists of cleaning and reshaping ditches, rework shoulders and utility strips, tree trimming and removal, power shearing and brush removal on department maintained roadways on an as-needed basis, performance turf, sod SY 5,000.00, clearing & grubbing AC 3.00, clean and reshape ditch (haul) LF 10,000.00, reworking shoulders (spot repairs) SY 4,500.00, reworking utility strips SY 10,000.00, reworking retention pond slopes SY 1,000.00, blading paved shoulder, up to 24" beyond pavement LF 10,560.00, tree removal (4" to 12") EA 125.00, stump removal (less than 4") EA 75.00. See attached file.
AvailableWork consists of remove pond island; installation of culverts for flood and erosion control; install fountain; pond maintenance plan; dredge out overflow silt pond.
Posted Date
Sep 20, 2022
Due Date
Oct 11, 2027
Release: Sep 20, 2022
Close: Oct 11, 2027
Work consists of remove pond island; installation of culverts for flood and erosion control; install fountain; pond maintenance plan; dredge out overflow silt pond.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →