City Of Milwaukee
Remodeling and repairs project includes replace missing downspout, between 2nd-floor dormer and lower gutter, on the south side of house, remove and replace existing guardrails, rubber flooring, and decking, 1st-floor door replacement, storm windows (3), handrails, 1st-floor plaster and paint repairs, install a combination smoke/co alarm in the basement, between 1st and 2nd floor and replace the flexible dryer vent with a solid walled galvanized vent pipe.
E-BID-3881-N-24th-Pl
Release
Oct 02, 2024
Close
Oct 16, 2024