Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of repair the existing precast deck units. Patch the concrete abutments, install new 4" thick concrete slab, excavate within the park area, reconstruct deck joints, removal of existing bituminous pavement and placement of new overlay, application of membrane waterproofing, removal of existing concrete sidewalks, casting of new sidewalks, installation of new trees and shrubs, and related work and materials.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of repair the existing precast deck units. Patch the concrete abutments, install new 4" thick concrete slab, excavate within the park area, reconstruct deck joints, removal of existing bituminous pavement and placement of new overlay, application of membrane waterproofing, removal of existing concrete sidewalks, casting of new sidewalks, installation of new trees and shrubs, and related work and materials.
Posted Date
Dec 18, 2025
Due Date
Jan 29, 2026
Release: Dec 18, 2025
Close: Jan 29, 2026
Work consists of repair the existing precast deck units. Patch the concrete abutments, install new 4" thick concrete slab, excavate within the park area, reconstruct deck joints, removal of existing bituminous pavement and placement of new overlay, application of membrane waterproofing, removal of existing concrete sidewalks, casting of new sidewalks, installation of new trees and shrubs, and related work and materials.
AvailableWork includes bridge rehabilitation.
Posted Date
Jan 3, 2026
Due Date
Feb 3, 2026
Release: Jan 3, 2026
Close: Feb 3, 2026
Work includes bridge rehabilitation.
AvailableBridge rehabilitation - bridge superstructure metal rail repair, crack repair type c, beam end repair, concrete. Surface repair, epoxy overlay maintenance, portable temporary rumble strip array, pavement marking.
Posted Date
Jan 13, 2026
Due Date
Feb 25, 2026
Release: Jan 13, 2026
Close: Feb 25, 2026
Bridge rehabilitation - bridge superstructure metal rail repair, crack repair type c, beam end repair, concrete. Surface repair, epoxy overlay maintenance, portable temporary rumble strip array, pavement marking.
AvailableBridge deck rehabilitation.
Posted Date
Oct 21, 2025
Due Date
Jan 30, 2026
Release: Oct 21, 2025
Close: Jan 30, 2026
Bridge deck rehabilitation.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis