Connecticut Office of the Attorney General
State AgencyCT
Posted
Aug 26, 2026
Sep 23, 2026
Rehabilitation of Bridge 00906 on Shepaug River RFP
Work includes 50 TN disposal of hazardous waste; 1,400 CY earth excavation; 150 TN disposal of controlled materials; 60 LF cut concrete pavement; 390 SY removal of concrete pavement; 310 LF cut bituminous concrete pavement; 90 CY structure excavation earth; 540 CY free drain material; 820 SY formation of subgrade; 110 CY granual fill; 75 CY previous structure backfill; 2,390 LF sedimentation control system. See attached file.