Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes rehabilitation of bridge.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work include 1415 CY earth excavation; 1,280 LF sedimentation control; 70 LF sawing and sealing joints; 420 LF gutter line sealing for bridges; 29 LF 1-1/2" polyvinyl chloride plastic pipe; 265 SF 12" preformed expansion joint filler for bridges; 1,250 LF pre-augering of piles; 1110 CY special riprap; 220 LF 6" granite stone curbing; 391 LF 3 tube curb mounted bridge rail; 1150 SF sidewalk; 20 SF erosion control; 930 LF 4" yellow epoxy resin pavement marking. See outside link for more.
Posted Date
Nov 26, 2025
Due Date
Jan 21, 2026
Release: Nov 26, 2025
Close: Jan 21, 2026
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work include 1415 CY earth excavation; 1,280 LF sedimentation control; 70 LF sawing and sealing joints; 420 LF gutter line sealing for bridges; 29 LF 1-1/2" polyvinyl chloride plastic pipe; 265 SF 12" preformed expansion joint filler for bridges; 1,250 LF pre-augering of piles; 1110 CY special riprap; 220 LF 6" granite stone curbing; 391 LF 3 tube curb mounted bridge rail; 1150 SF sidewalk; 20 SF erosion control; 930 LF 4" yellow epoxy resin pavement marking. See outside link for more.
AvailableWork includes rehabilitation of bridge.
Posted Date
-
Due Date
Jan 12, 2026
Release: -
Close: Jan 12, 2026
Work includes rehabilitation of bridge.
AvailableRemoval and replacement of bridge rail bridge rail end blocks, grading, removal of asphalt mat from bridge, repairs of concrete bridge deck and structures, waterproofing of bridge deck, asphalt patching, asphalt milling, overlay paving, installation of concrete curb, sidewalk, curb ramps and chase drain.
Posted Date
Dec 17, 2025
Due Date
Feb 26, 2026
Release: Dec 17, 2025
Close: Feb 26, 2026
Removal and replacement of bridge rail bridge rail end blocks, grading, removal of asphalt mat from bridge, repairs of concrete bridge deck and structures, waterproofing of bridge deck, asphalt patching, asphalt milling, overlay paving, installation of concrete curb, sidewalk, curb ramps and chase drain.
AvailableOconto County is soliciting proposals to remove the existing rail truss bridge and install a new clear‑span recreational bridge over the Little River in the Town of Stiles. Proposals must be submitted via DemandStar or delivered to the Oconto County Forest & Parks Department by the deadline.
Posted Date
Nov 19, 2025
Due Date
Jan 5, 2026
Release: Nov 19, 2025
Close: Jan 5, 2026
Oconto County is soliciting proposals to remove the existing rail truss bridge and install a new clear‑span recreational bridge over the Little River in the Town of Stiles. Proposals must be submitted via DemandStar or delivered to the Oconto County Forest & Parks Department by the deadline.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →