Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The refurbishment of six (6) rectangular secondary clarifiers located at Water Reclamation Plant 10. These clarifiers are an integral component of the secondary treatment process, facilitating the gravity settling and removal of suspended solids.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes demolish existing chlorine contact basin and connected appurtenances; build new splitter structure and pipes connecting to the existing secondary clarifiers.
Posted Date
-
Due Date
Feb 5, 2026
Close: Feb 5, 2026
Work includes demolish existing chlorine contact basin and connected appurtenances; build new splitter structure and pipes connecting to the existing secondary clarifiers.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Brunswick County is soliciting bids for the construction of the Carolina Shores WWTP Clarifiers Splitter Box, which includes demolishing an existing chlorine contact basin and building new splitter structures and pipes.
Posted Date
Dec 19, 2025
Due Date
Feb 5, 2026
Release: Dec 19, 2025
Close: Feb 5, 2026
Brunswick County is soliciting bids for the construction of the Carolina Shores WWTP Clarifiers Splitter Box, which includes demolishing an existing chlorine contact basin and building new splitter structures and pipes.
AvailableWork consists of primary clarifiers rehabilitation, includes rehabilitation of ten rectangular primary clarifiers through improvements to the primary clarifiers sludge collection systems, scum collection systems, internal concrete surfaces, covers, hatches, fall protection grating, fall protection improvements, scum pumping system, and recycled water line.
Posted Date
Jan 12, 2026
Due Date
Feb 12, 2026
Release: Jan 12, 2026
Close: Feb 12, 2026
Work consists of primary clarifiers rehabilitation, includes rehabilitation of ten rectangular primary clarifiers through improvements to the primary clarifiers sludge collection systems, scum collection systems, internal concrete surfaces, covers, hatches, fall protection grating, fall protection improvements, scum pumping system, and recycled water line.
AvailableRelease: Aug 13, 2025
Close: Nov 28, 2026
Air Handler Refurbishment
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →