Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replace the main generator at the Columbia Generating Station, nuclear power generating facility with a boiling water reactor, 1,200-megfawatt electric generation unit, during refuel outage 30.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Replacement of a class 8 truck with tandem rear axel and wet lines, which is used to haul a flat bed trailer.
Posted Date
Jan 9, 2026
Due Date
Feb 6, 2026
Release: Jan 9, 2026
Close: Feb 6, 2026
Replacement of a class 8 truck with tandem rear axel and wet lines, which is used to haul a flat bed trailer.
AvailableGenerating station unit 8 recycled water cooling system retrofit.
Posted Date
Mar 31, 2025
Due Date
Mar 31, 2026
Release: Mar 31, 2025
Close: Mar 31, 2026
Generating station unit 8 recycled water cooling system retrofit.
AvailableWork includes installation of a new/complete sanitary sewer lift station and 2" HDPE private force main, including all connections and appurtenance.
Posted Date
Jan 19, 2026
Due Date
Feb 13, 2026
Release: Jan 19, 2026
Close: Feb 13, 2026
Work includes installation of a new/complete sanitary sewer lift station and 2" HDPE private force main, including all connections and appurtenance.
AvailableLift station and force main construction work includes 1,698 LF 4" ASTM D2241 PVC pipe force main, non str backfill; 1,858 LF 4" ASTM D2241 PVC pipe force main, str backfill; 7 EA 4" MJ bend; 1 EA connec to existing manhole; 3,246 LF 2" PVC sch 40 water line; 1 EA water meter and RPZ; see outside link.
Posted Date
Dec 31, 2025
Due Date
Jan 23, 2026
Release: Dec 31, 2025
Close: Jan 23, 2026
Lift station and force main construction work includes 1,698 LF 4" ASTM D2241 PVC pipe force main, non str backfill; 1,858 LF 4" ASTM D2241 PVC pipe force main, str backfill; 7 EA 4" MJ bend; 1 EA connec to existing manhole; 3,246 LF 2" PVC sch 40 water line; 1 EA water meter and RPZ; see outside link.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis