Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes installation of a new/complete sanitary sewer lift station and 2" HDPE private force main, including all connections and appurtenance.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The project includes the following work: installation of sewer lift station and installation of sewer force main.
Posted Date
Jan 4, 2026
Due Date
Feb 6, 2026
Release: Jan 4, 2026
Close: Feb 6, 2026
The project includes the following work: installation of sewer lift station and installation of sewer force main.
AvailablePremium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Lift station and force main construction work includes 1,698 LF 4" ASTM D2241 PVC pipe force main, non str backfill; 1,858 LF 4" ASTM D2241 PVC pipe force main, str backfill; 7 EA 4" MJ bend; 1 EA connec to existing manhole; 3,246 LF 2" PVC sch 40 water line; 1 EA water meter and RPZ; see outside link.
Posted Date
Dec 31, 2025
Due Date
Jan 23, 2026
Release: Dec 31, 2025
Close: Jan 23, 2026
Lift station and force main construction work includes 1,698 LF 4" ASTM D2241 PVC pipe force main, non str backfill; 1,858 LF 4" ASTM D2241 PVC pipe force main, str backfill; 7 EA 4" MJ bend; 1 EA connec to existing manhole; 3,246 LF 2" PVC sch 40 water line; 1 EA water meter and RPZ; see outside link.
AvailableWork includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
Posted Date
Nov 23, 2025
Due Date
Jan 21, 2026
Release: Nov 23, 2025
Close: Jan 21, 2026
Work includes New 9.25 MGD lift station; 18” ID circular wet well with Canopy Covering and Trolley Hoist; 3 submersible pumps with VFDs; New CMU Electrical Building; New Generator Site Improvements, Grading, and Paving; Installation of 24” HDPE (DR-17) force main by open-cut and trenchless methods; Furnish and Install thirteen (13) 2” combination air release/ vacuum valves; Furnish and Install four (4) 24” direct bury plug valves; Furnish and Install 6" Force Main Lateral including 6" Plug Valve, 2" CAV, 6" MJ End Cap, Couplings, Fittings Tees, Concrete Structure, and Backfill Material; Furnish and Install 2" Force Main Lateral including 2" Plug Valve, 2" CTS Compression End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Furnish and Install 3" Force Main Lateral including 3" Plug Valve, 3" MJ End Cap, Couplings, Fittings, Tees, Concrete Structure, and Backfill Material; Including but not limited to, clearing and grubbing, hydromulch and seeding, dewatering, hydrostatic testing, and pavement replacement; Demolition of existing lift station.;
Construction for replacement of existing force main with approximately 2,900 LF of new 16" C900 PVC sewer force main with ductile iron fittings with mechanical restraint joint connections, along with appurtenances and other work incidental to the project as specified in the Contract Document and Project Plans.
Posted Date
Dec 21, 2025
Due Date
Jan 27, 2026
Release: Dec 21, 2025
Close: Jan 27, 2026
Construction for replacement of existing force main with approximately 2,900 LF of new 16" C900 PVC sewer force main with ductile iron fittings with mechanical restraint joint connections, along with appurtenances and other work incidental to the project as specified in the Contract Document and Project Plans.