CityMN
Posted
Sep 10, 2026
Oct 1, 2026
Wellhouse No. 11 Raw Watermain Extension RFP
Project includes but not limited to approx. 15 EA Clearing and Grubbing; 400 LF Remove and Replace Concrete Curb and Gutter; 400 LF Remove Watermain; 2,400 SY Remove Bituminous Walk, Bituminous Pavement, and Bituminous Driveway; 100 LF Abandon Watermain; 1,800 SY Type SP 9.5 Wear Course Mix (2,B) 3.0" Thick; 3,500 LF 6" – 36" PVC Watermain; 1,600 LF 16" – 24" PVC Watermain (Directionally Drilled); 1,800 LF 16" – 24" HDPE Watermain (Directionally Drilled).