Summary
Construction of approx. 6. 5 mi of 72" dia. Steel water pipeline, including three 96" dia. Trenchless wetland and road crossings. Strict segregation and stockpiling of topsoil and subsoil for pipe installation will be required. The work also includes an impressed current pipeline corrosion protection system, pipeline appurtenances, and all other work specified or shown on the drawings. Work includes, 22,419 LF of 72" steel pipe (class 300) - installed by open cut; 451 LF of trenchless crossing - 72" steel carrier pipe (0.500" thick); 451 LF of trenchless crossing - 96" casing pipe; 120 LF of gravel pavement removal and replacement; 22,870 LF of remove/stockpile topsoil.