Retrieving RFP details
Release
Close
Garrison Diversion Conservancy District
The work consists of construction of approx., 8.4 miles of 72" diameter steel water pipeline, including one 96-inch diameter trenchless railroad crossing and two 96" diameter trenchless wetland crossings.
Garrison Diversion Conservancy District
The work consists of construction of approx. 9.2 mi of 72" dia. steel water pipeline, including one 96" dia. trenchless wetland crossing. Strict segregation and stockpiling of topsoil and subsoil for pipe installation will be required. The work also includes an impressed current pipeline corrosion protection system, pipeline appurtenances, and all other work specified or shown on the drawings.
Garrison Diversion Conservancy District
Construction of approx. 6.5 mi of 72" dia. steel water pipeline, including three 96" dia. trenchless wetland and road crossings. Strict segregation and stockpiling of topsoil and subsoil for pipe installation will be required. The work also includes an impressed current pipeline corrosion protection system, pipeline appurtenances, and all other work specified or shown on the drawings.
City of Woodbury
Raw Water Transmission Pipeline.
Release
Oct 27, 2025
Close
Nov 19, 2025