Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Verified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
City of Festus
Provide geotechnical engineering and construction materials testing and inspection services.
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Auburn University
Work includes but is not limited to: the red barn comprehensive renovation will encompass structural repairs, enhancements to life-safety systems and accessibility, and alterations.
Posted Date
Nov 7, 2025
Due Date
Dec 11, 2025
Release: Nov 7, 2025
Auburn University
Close: Dec 11, 2025
Work includes but is not limited to: the red barn comprehensive renovation will encompass structural repairs, enhancements to life-safety systems and accessibility, and alterations.
AvailableVerified names, emails & phone numbers
AI-predicted best buyers in the org
Auto-sync to Salesforce & HubSpot
Access the largest public sector contact database
See which competitors are likely to bid
Line-item pricing breakdowns
Contract expiration map of your TAM
Get complete source documentation & analysis
Indian River State College
Partial renovation of first floor and third floor, full renovation of second floor, building n. No change of use or occupancy. Replacing doors and updating lab equipment are part of the scope of work. No revisions to existing life safety or exiting are proposed.
Posted Date
Nov 20, 2025
Due Date
Jan 5, 2026
Release: Nov 20, 2025
Indian River State College
Close: Jan 5, 2026
Partial renovation of first floor and third floor, full renovation of second floor, building n. No change of use or occupancy. Replacing doors and updating lab equipment are part of the scope of work. No revisions to existing life safety or exiting are proposed.
AvailableMilwaukee County
Redevelopment and restoration of the County-owned Red Barn building located outside the entrance to the Boerner Botanical Gardens in Whitnall Park. The successful Proposer will be required to enter into a three (3)-year agreement with seven (7) optional one (1) year renewal terms.
Posted Date
Nov 3, 2025
Due Date
Dec 16, 2025
Release: Nov 3, 2025
Milwaukee County
Close: Dec 16, 2025
Redevelopment and restoration of the County-owned Red Barn building located outside the entrance to the Boerner Botanical Gardens in Whitnall Park. The successful Proposer will be required to enter into a three (3)-year agreement with seven (7) optional one (1) year renewal terms.
AvailableCity of Joplin
Provide construction services. The construction will occur at an existing outbuilding, "cart barn". The state of the current floor is a combination of gravel and broken old asphalt, request is being made for the current floor to be removed and replaced with concrete. Work includes removal of old flooring materials; site preparation and grading for new flooring; forming and reinforcement (rebar) as needed; pouring and finishing of concrete; surface finish as requested (smooth); any necessary control joints or relief cuts; cleanup and disposal of any waste. 2,080 sqft existing floor replacement (4" 3,000-4,000psi); 1,440 sqft full addition (4" 3,000-4,0000psi); 1,080 sqft partial addition (4" 3,000-4,000psi).
Posted Date
Nov 21, 2025
Due Date
Dec 22, 2025
Release: Nov 21, 2025
City of Joplin
Close: Dec 22, 2025
Provide construction services. The construction will occur at an existing outbuilding, "cart barn". The state of the current floor is a combination of gravel and broken old asphalt, request is being made for the current floor to be removed and replaced with concrete. Work includes removal of old flooring materials; site preparation and grading for new flooring; forming and reinforcement (rebar) as needed; pouring and finishing of concrete; surface finish as requested (smooth); any necessary control joints or relief cuts; cleanup and disposal of any waste. 2,080 sqft existing floor replacement (4" 3,000-4,000psi); 1,440 sqft full addition (4" 3,000-4,0000psi); 1,080 sqft partial addition (4" 3,000-4,000psi).
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →