Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work includes 1 LS purchase and install of two (2) heaters - lochinvar power-fin boiler model pbn1501-m9, 1.5mbtuh; 1 LS electrical; 1 LS plumbing; 1 LS natural gas line plumbing and installation of ysaqmd approved gas tracking meter ; 1 LS off-gas venting; 1 LS commissioning: including system start-up, testing, and gas and water leak testing; 1 LS training of designated city staff in operations, maintenance, and control system usage.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Seeking qualified Design-Build Team Partners ("Contractor" “Design-Builder” “D-B” “D-B Team” "Consultant") to provide professional Architecture, Engineering, and Construction services for the Sterling Recreation Center Pool. The Project is considered a Traditional Design-Build, which will be managed by the Mayor’s Office of Capital Projects (MOCAP), through the Division of Architecture and Site Development (DASD).
Posted Date
Jan 16, 2026
Due Date
Feb 4, 2026
Release: Jan 16, 2026
Close: Feb 4, 2026
Seeking qualified Design-Build Team Partners ("Contractor" “Design-Builder” “D-B” “D-B Team” "Consultant") to provide professional Architecture, Engineering, and Construction services for the Sterling Recreation Center Pool. The Project is considered a Traditional Design-Build, which will be managed by the Mayor’s Office of Capital Projects (MOCAP), through the Division of Architecture and Site Development (DASD).
AvailableCommercial water heater replacement.
Posted Date
Dec 18, 2025
Due Date
Feb 13, 2026
Release: Dec 18, 2025
Close: Feb 13, 2026
Commercial water heater replacement.
AvailableRelease: Jan 16, 2026
Close: Feb 19, 2026
Water heater replacement.
AvailableThe Cosumnes Community Services District is seeking proposals for pool heater inspection and service at Jerry Fox Swim Center, Wackford Community & Aquatic Complex, and Elk Grove Aquatics Center.
Posted Date
Jan 16, 2026
Due Date
Feb 12, 2026
Release: Jan 16, 2026
Close: Feb 12, 2026
The Cosumnes Community Services District is seeking proposals for pool heater inspection and service at Jerry Fox Swim Center, Wackford Community & Aquatic Complex, and Elk Grove Aquatics Center.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis