Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Provide total reconstruction of street, sidewalk, and waterline distribution system.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
This RFP is for the replacement of culinary waterline and services, pressurized irrigation services, sidewalk, curb and gutter, pedestrian access ramps, and pavement reconstruction in specified areas of Pleasant Grove City.
Posted Date
Jan 15, 2026
Due Date
Feb 3, 2026
Release: Jan 15, 2026
Close: Feb 3, 2026
This RFP is for the replacement of culinary waterline and services, pressurized irrigation services, sidewalk, curb and gutter, pedestrian access ramps, and pavement reconstruction in specified areas of Pleasant Grove City.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction of a new pedestrian sidewalk along the south side of mechanic street. The sidewalk will extend an existing sidewalk and be constructed between 95 mechanic street and the slayton hill road intersection to improve pedestrian accessibility and safety along the project corridor. Project elements include the installation of granite curbing, bituminous concrete sidewalk, driveway apron reconstruction, stormwater infrastructure, a concrete block retaining wall, landscape restoration, and associated roadway patching.
Posted Date
Jan 7, 2026
Due Date
Jan 28, 2026
Release: Jan 7, 2026
Close: Jan 28, 2026
Construction of a new pedestrian sidewalk along the south side of mechanic street. The sidewalk will extend an existing sidewalk and be constructed between 95 mechanic street and the slayton hill road intersection to improve pedestrian accessibility and safety along the project corridor. Project elements include the installation of granite curbing, bituminous concrete sidewalk, driveway apron reconstruction, stormwater infrastructure, a concrete block retaining wall, landscape restoration, and associated roadway patching.
AvailableRelease: Jan 8, 2026
Close: Jan 27, 2026
Street & Utility Reconstruction Project.
AvailableThe City of Davenport, IA is soliciting sealed bids for the Pine Street Reconstruction Project covering Pine Street between 49th Street and 53rd Street, including full roadway reconstruction, subdrains, ADA-compliant sidewalks and ramps, utility adjustments, driveway replacements, striping, and landscaping/erosion control. Bidders must register in the City of Davenport electronic bidding system and provide required bonds and insurance; bids over $100,000 require a 5% Bid Bond and a 100% Performance Bond upon award. The contract work must be completed by June 30, 2026, and electronic bid submissions are due February 10, 2026 at 10:00 AM CT.
Posted Date
Jan 16, 2026
Due Date
Feb 10, 2026
Release: Jan 16, 2026
Close: Feb 10, 2026
The City of Davenport, IA is soliciting sealed bids for the Pine Street Reconstruction Project covering Pine Street between 49th Street and 53rd Street, including full roadway reconstruction, subdrains, ADA-compliant sidewalks and ramps, utility adjustments, driveway replacements, striping, and landscaping/erosion control. Bidders must register in the City of Davenport electronic bidding system and provide required bonds and insurance; bids over $100,000 require a 5% Bid Bond and a 100% Performance Bond upon award. The contract work must be completed by June 30, 2026, and electronic bid submissions are due February 10, 2026 at 10:00 AM CT.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →