Reconstruction of Jefferson Avenue

Borough of Cresskill

Summary

Work includes: clearing site, 15" reinforced concrete pipe - class v, excavation, test pit, inlet, type "b", inlet, type "b", use existing casting, manhole, 4' dia, reset existing casting, hma milling, 3" or less, hot mix asphalt 9.5M64 surface course, hot mix asphalt 19M64 base course, belgian block curb, concrete sidewalk, 4" thick, concrete sidewalk, reinforced, 6" thick, concrete driveway, reinforced, 6" thick, detectable warning surface, HMA driveway, 2" thick, reset precast concrete pavers, traffic stripes, 4", traffic stripes, 8", traffic markings lines, 24", topsoil spreading, 4" thick, fertilizing & seeding, type a-3, straw mulching and other incidental work.