Oklahoma Department of Transportation
State AgencyOK
Posted
Apr 22, 2020
Sep 17, 2026
260156 - Intersection Modification - SH-78: At the Intersection of Gerlach Drive
Intersection modification. Work includes 1 LS clearing and grubbing; 3,668 CY of unclassified excavation; 11,138 SY of solid slab sodding; 2,928 CY of type A aggregate base; 3,400 SY of cold milling pavement; 367 SY of 4" concrete sidewalk; 172 SY of 6" concrete driveway; 20 SF of new tactile warning device; 1 EA 5' dia manhole; 379 LF of 18" Cl III RC pipe; 4,649 LF of sawing pavement; 100 LF of 54" jack and bore steel casing; 27 LF of 6" PVC pipe; 60 LF of 8" PVC water line pipe; 657 LF of 10" PVC pipe; 872 LF of 12" PVC pipe; 1,413 LF of 16" PVC pipe; 45 LF of 18" PVC pipe; 897 LF of 24" PVC pipe; 205 LF of 36" PVC water line; 1 EA 2" meter installation; 3 EA fire hydrant and assembly; 100 LF of 16" bore and jack casing; 252 LF of 8" directional bore; 124 LF of 10" directional bore; 19 LF of 14" directional bore; 184 LF of 16" directional bore; 17 LF of 30" directional bore; 511 LF of 36" directional bore; 4 EA short service connection; 11 LF of 2" HDPE pipe; 367 LF of 8" HDPE pipe; 124 LF of 10" HDPE pipe; 511 LF of 36" HDPE pipe; 4 EA roadway luminaire; pavement markings. See attached file.