Closing soonReconstruction of 84th Avenue and Riley Street Bike Path RFP
Description: Provide a street reconstruction project involving roadway grading, paving, and storm sewer installation. The work includes approx., 5,800 SY of aggregate base, 540 feet of 18-inch storm sewer, 2,800 FT of concrete curb and gutter, asphalt paving, drainage structures, and restoration; 115 ft of curb and gutter, rem; 15 STA of roadway grading; 8 EA of erosion control, inlet protection, fabric drop; 5,800 SY of aggregate base, 8", 21AA; 152 ft of sewer, CI E, 12", Tr Det B; 856 ft of video taping sewer and culv pipe; maintain storm sewer; 9 EA of Dr structure cover, type B; 240 SY of HMA surface, rem; 5 TON of hand patching. See the link.