Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contract 1, Elevated Water Storage Tank involves replacing the existing water storage tank, with a 500,000-gallon elevated spheroidal water storage tank and appurtenances.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work include well water tank replacement.
Posted Date
Nov 3, 2025
Due Date
Jan 22, 2026
Release: Nov 3, 2025
Close: Jan 22, 2026
Work include well water tank replacement.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
One-time purchase of glycol water expansion tank for bog compressor replacement at plant.
Posted Date
Aug 18, 2025
Due Date
Jan 23, 2026
Release: Aug 18, 2025
Close: Jan 23, 2026
One-time purchase of glycol water expansion tank for bog compressor replacement at plant.
AvailableContract #1: Water Distribution System Upgrades that consist of approximately 6,100 LF of 8” PVC, 13,050 LF of 6” PVC, 2,190 LF of 4” PVC, and 2,100 LF of 2” PVC Waterline. The project will also consist of approximately 3,100 LF of various sized customer service line ranging from ¾” to 1-1/2”. Approximately 210 customers will be reconnected, 45 EA Gate Valves ranging in size from 2” to 8” will be installed, 14 EA Fire Hydrants will be installed and all related appurtenances to complete the project. See outside link.
Posted Date
Oct 16, 2025
Due Date
Jan 27, 2026
Release: Oct 16, 2025
Close: Jan 27, 2026
Contract #1: Water Distribution System Upgrades that consist of approximately 6,100 LF of 8” PVC, 13,050 LF of 6” PVC, 2,190 LF of 4” PVC, and 2,100 LF of 2” PVC Waterline. The project will also consist of approximately 3,100 LF of various sized customer service line ranging from ¾” to 1-1/2”. Approximately 210 customers will be reconnected, 45 EA Gate Valves ranging in size from 2” to 8” will be installed, 14 EA Fire Hydrants will be installed and all related appurtenances to complete the project. See outside link.
AvailableThe work for the 1 MG Water Storage Tank Project (Contract 52W-A) consists of the removal of the existing 1 MG water storage tank and its appurtenances on Block 4, Lot 30 and the installation of a new 1 MG water storage tank on Block 4, Lot 1.05.
Posted Date
Dec 14, 2025
Due Date
Jan 28, 2026
Release: Dec 14, 2025
Close: Jan 28, 2026
The work for the 1 MG Water Storage Tank Project (Contract 52W-A) consists of the removal of the existing 1 MG water storage tank and its appurtenances on Block 4, Lot 30 and the installation of a new 1 MG water storage tank on Block 4, Lot 1.05.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →