Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The proposed project consists of providing all site work, materials, equipment, and labor necessary to repair failed sheet pile patches and fill existing voids behind the seawall of the mole pier at Navy Port Operations. Sheet pile repair to include fabrication of steel repair panels, requiring underwater welding. Filling of voids to be accomplished using polyurethane foam grout injection. Environmental permits will be provided by the EOR. In addition, the scope includes all materials and electrical work necessary for the installation of four (4) 50-amp dock pedestals, including conduit, wiring, terminations, AMI meter, enclosure, disconnects, and coordination with utility connections as required to provide fully functional units.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Work includes site work, materials, equipment, and labor necessary to repair failed sheet pile patches and fill existing voids behind the seawall of the mole pier. Sheet pile repair to include fabrication of steel repair panels, requiring underwater welding. Filling of voids to be accomplished using polyurethane foam grout injection. See engineered drawings. Environmental permits will be provided by the eor. In addition, the scope includes all materials and electrical work necessary for the installation of four (4) 50-amp dock pedestals, including conduit, wiring, terminations, ami meter, enclosure, disconnects, and coordination with utility connections as required to provide fully functional units. See outside link.
Posted Date
Aug 23, 2025
Due Date
Feb 18, 2026
Release: Aug 23, 2025
Close: Feb 18, 2026
Work includes site work, materials, equipment, and labor necessary to repair failed sheet pile patches and fill existing voids behind the seawall of the mole pier. Sheet pile repair to include fabrication of steel repair panels, requiring underwater welding. Filling of voids to be accomplished using polyurethane foam grout injection. See engineered drawings. Environmental permits will be provided by the eor. In addition, the scope includes all materials and electrical work necessary for the installation of four (4) 50-amp dock pedestals, including conduit, wiring, terminations, ami meter, enclosure, disconnects, and coordination with utility connections as required to provide fully functional units. See outside link.
AvailableProcurement of construction services for the removal and disposal of an existing fishing pier, including related structures and utilities, and site repair, for the Sunset Point Fishing Pier, Handicap Pier, and Site Repair Project.
Posted Date
Jan 21, 2026
Due Date
Feb 25, 2026
Release: Jan 21, 2026
Close: Feb 25, 2026
Procurement of construction services for the removal and disposal of an existing fishing pier, including related structures and utilities, and site repair, for the Sunset Point Fishing Pier, Handicap Pier, and Site Repair Project.
AvailableThe work of this contract consists of removal and lawful disposal of the existing fishing pier inclusive of piles, deck and structure, shelter, roof, lighting, conduits and conductors, water piping, benches, concrete bulk debris, concrete ramp, capping onshore buried utilities, and all miscellaneous and supporting items of work.
Posted Date
Jan 9, 2026
Due Date
Feb 25, 2026
Release: Jan 9, 2026
Close: Feb 25, 2026
The work of this contract consists of removal and lawful disposal of the existing fishing pier inclusive of piles, deck and structure, shelter, roof, lighting, conduits and conductors, water piping, benches, concrete bulk debris, concrete ramp, capping onshore buried utilities, and all miscellaneous and supporting items of work.
AvailableProvide Brickell and Coconut Grove Seawall Improvements.
Posted Date
Dec 21, 2025
Due Date
Jan 30, 2026
Release: Dec 21, 2025
Close: Jan 30, 2026
Provide Brickell and Coconut Grove Seawall Improvements.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis