Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Reactivation of 40,000 lbs of granular activated carbon for water treatment vessels.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work includes remove approximately 96" of spent granular activated carbon (gac) and to install a total of 94,500 lbs. Or 96 inches of virgin (gac) filter medium and absorbent in one (1) filter for one year supply of granular activated carbon.
Posted Date
Jan 28, 2026
Due Date
Feb 11, 2026
Release: Jan 28, 2026
Close: Feb 11, 2026
Work includes remove approximately 96" of spent granular activated carbon (gac) and to install a total of 94,500 lbs. Or 96 inches of virgin (gac) filter medium and absorbent in one (1) filter for one year supply of granular activated carbon.
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Contractor to remove and legally dispose of existing piping, pump, valving, and appurtenances; water plant improvements: contractor to furnish and install proposed yard piping, valving, and appuretenances including but not limited to modifications to existing booster pump discharge header, installation of granular activated carbon filter influent and effluent piping, installation of backwash drain piping, and modifications to existing ground storage tank inlet piping; Contractor to furnish and install proposed modular carbon adosrber system including, two (2) (10' Ø x 22' L) ASME code pressure filters, granular activated carbon media, piping, valving, interior and exterior coatings, structural supports, pressure relief valves, pressure gauges, and appurtenances; 80 SY furnish and install proposed 18" thick reinforced concrete foundation including excavation, subgrade preparation, bedding,forming, reinforcing steel, material, supervision, and appurtenances; Contractor to remove and replace existing chemical feed system booster pump including but not limited pump, electric motor, modifications to exisitng suction and discharge piping to accommodate new pump, electrical wiring, and connection to existing control systems; 265 LF furnish and install 8" AWWA C-900 PVC sanitary sewer including piping, fittings, bedding, backfill, and appurtenances;
Posted Date
Jan 20, 2026
Due Date
Feb 5, 2026
Release: Jan 20, 2026
Close: Feb 5, 2026
Contractor to remove and legally dispose of existing piping, pump, valving, and appurtenances; water plant improvements: contractor to furnish and install proposed yard piping, valving, and appuretenances including but not limited to modifications to existing booster pump discharge header, installation of granular activated carbon filter influent and effluent piping, installation of backwash drain piping, and modifications to existing ground storage tank inlet piping; Contractor to furnish and install proposed modular carbon adosrber system including, two (2) (10' Ø x 22' L) ASME code pressure filters, granular activated carbon media, piping, valving, interior and exterior coatings, structural supports, pressure relief valves, pressure gauges, and appurtenances; 80 SY furnish and install proposed 18" thick reinforced concrete foundation including excavation, subgrade preparation, bedding,forming, reinforcing steel, material, supervision, and appurtenances; Contractor to remove and replace existing chemical feed system booster pump including but not limited pump, electric motor, modifications to exisitng suction and discharge piping to accommodate new pump, electrical wiring, and connection to existing control systems; 265 LF furnish and install 8" AWWA C-900 PVC sanitary sewer including piping, fittings, bedding, backfill, and appurtenances;
AvailableSupply granular activated carbon and sand filter media on as needed basis.
Posted Date
Jan 8, 2026
Due Date
Feb 24, 2026
Release: Jan 8, 2026
Close: Feb 24, 2026
Supply granular activated carbon and sand filter media on as needed basis.
AvailableRivanna Water & Sewer Authority is soliciting sealed bids for removal of spent granular activated carbon, reactivation, and installation of new virgin GAC across five water treatment plants in the Charlottesville/Albemarle service area. The work includes furnishing materials, labor, transport, and compliance with AWWA and NSF standards, with reactivated GAC stored and reinstalled as needed. The base term is two years with options to renew.
Posted Date
-
Due Date
Apr 17, 2026
Close: Apr 17, 2026
Rivanna Water & Sewer Authority is soliciting sealed bids for removal of spent granular activated carbon, reactivation, and installation of new virgin GAC across five water treatment plants in the Charlottesville/Albemarle service area. The work includes furnishing materials, labor, transport, and compliance with AWWA and NSF standards, with reactivated GAC stored and reinstalled as needed. The base term is two years with options to renew.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →