Retrieving RFP details
Release
Close
City of Laurinburg
DESIGN-BUILD: Provide design-build services for the raw water wells-phase ii project.
1 - Re-Advertisement
City of Everett
Construct approx. 1,020 LF of 12" ductile iron watermain and appurtenances, including relocation of an existing PRV station, site restoration, installation of water main in 18" casing on the existing I-5 bridge structure over the Snohomish River and BNSF Railroad, and removal and disposal of the existing 8" waterline on the I-5 bridge, and performing all other work as required by the contract.
Lubbock County Sheriff's Office
Woodrow road - phase II.
Johnston Community School District
Base bid consists of re-roofing all existing and fully adhered and ballasted EPDM roofs to remove existing 2" thick river rock ballast and loose-laid EPDM roof membrane, any wet insulation and all perimeter membrane flashing, metal roof edge and counter flashings and install 2" thick rigid polyisocryanurate roof insulation screw fastened. See outside link.
Release
Sep 19, 2025
Close
Nov 12, 2025