Discover Opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
The Tennessee Wildlife Resources Agency (TWRA) is soliciting bids for repair and shoreline stabilization work at the Rankin Boat Ramp in Cocke County, Tennessee. The project includes repair/installation of soil, rock, geotextile, mulch, vegetation, and removal/disposal of trees, logs and stumps, with a required mandatory site visit and pre-bid meeting. Work must be completed within sixty (60) days of notice to proceed and must comply with TOSHA/OSHA and state procurement and environmental regulations.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Accepting sealed bids for shoreline stabilization. Shoreline stabilization would include the use of rip rap along approx 525ft of shoreline with approx 325 tons of rip rap. Shoreline stabilization (rip rap) shall be installed by boat.
Posted Date
Nov 10, 2025
Due Date
Jan 8, 2026
Release: Nov 10, 2025
Close: Jan 8, 2026
Accepting sealed bids for shoreline stabilization. Shoreline stabilization would include the use of rip rap along approx 525ft of shoreline with approx 325 tons of rip rap. Shoreline stabilization (rip rap) shall be installed by boat.
AvailablePremium
Access the largest public sector contact database
Request for proposals for the construction of a new boat ramp at Sallisaw Creek.
Posted Date
Nov 13, 2025
Due Date
Dec 12, 2025
Release: Nov 13, 2025
Close: Dec 12, 2025
Request for proposals for the construction of a new boat ramp at Sallisaw Creek.
1. Site preparation. perform detailed site assessment and layout verification. mobilize personnel, equipment, and materials to the project site 2. Earthwork. conduct excavation, grading, and subgrade preparation per design elevations 3. Concrete construction. install formwork and reinforcement. place and finish reinforced concrete for the boat ramp structure 4. Shoreline and access improvements. construct pedestrian and vehicle access pathways. provide shoreline stabilization (e. G. , riprap placement or equivalent measures) 5. Erosion and sediment control. implement and maintain best management practices (bmps) throughout construction 6. Site restoration. perform final grading, site cleanup, and restoration to preconstruction condition or better.
Posted Date
Nov 13, 2025
Due Date
Dec 12, 2025
Release: Nov 13, 2025
Close: Dec 12, 2025
1. Site preparation. perform detailed site assessment and layout verification. mobilize personnel, equipment, and materials to the project site 2. Earthwork. conduct excavation, grading, and subgrade preparation per design elevations 3. Concrete construction. install formwork and reinforcement. place and finish reinforced concrete for the boat ramp structure 4. Shoreline and access improvements. construct pedestrian and vehicle access pathways. provide shoreline stabilization (e. G. , riprap placement or equivalent measures) 5. Erosion and sediment control. implement and maintain best management practices (bmps) throughout construction 6. Site restoration. perform final grading, site cleanup, and restoration to preconstruction condition or better.
The Cherokee Nation Cultural and Economic Development (CED) is soliciting sealed proposals from qualified contractors for construction of a new boat ramp at Sallisaw Creek as part of the Cherokee Nation Park Project. Work includes site preparation, earthwork, concrete construction, shoreline and access improvements, erosion and sediment control, and site restoration; the project duration is 90 calendar days.
Posted Date
Nov 13, 2025
Due Date
Dec 12, 2025
Release: Nov 13, 2025
Close: Dec 12, 2025
The Cherokee Nation Cultural and Economic Development (CED) is soliciting sealed proposals from qualified contractors for construction of a new boat ramp at Sallisaw Creek as part of the Cherokee Nation Park Project. Work includes site preparation, earthwork, concrete construction, shoreline and access improvements, erosion and sediment control, and site restoration; the project duration is 90 calendar days.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Get complete source documentation & analysis