Aug 10, 2026
Closes
Aug 24, 2026
Rails For Watervliet Arsenal (Request for Quotes) Watervliet
Provide rails. 57 each--left rail. 41 each--right rail. See attached file.
Description: The U.S. Army Contracting Command at Watervliet Arsenal is soliciting quotes for semi-finished machined left and right rails manufactured to specified Army drawings. The solicitation increases the quantities to 60 left rails and 53 right rails, requires FOB-destination delivery, and calls for sample pricing. It is a total small-business set-aside under NAICS 332710, with offers due August 24, 2026, at 4:30 p.m. EDT.
Federal · NY, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Adjacent opportunities open for bidding right now.
Aug 10, 2026
Closes
Aug 24, 2026
Provide rails. 57 each--left rail. 41 each--right rail. See attached file.
Aug 14, 2026
Closes
Aug 20, 2026
Electropolish Tanks for the Watervliet Arsenal (Solicitation W911PT26QA116) requests manufacture and installation of replacement electropolish chemical tanks, specifically Tank T-204 and Tank T-304, per the provided drawings. Delivery is required within 60 days for Tank T-204 and 90 days for Tank T-304, and the procurement is a Total Small Business Set-Aside. The contracting activity is Army Contracting Command, Watervliet Arsenal, and responses are due Aug 20, 2026 at 4:00 PM EDT.
Aug 12, 2026
Closes
Sep 2, 2026
This active contract solicitation seeks 61 nuts manufactured to Drawing No. 11580005, Revision C, for the 81mm M177 mortar, including first-article pricing and required contract data deliverables. The procurement is a total small-business set-aside issued by ACC Watervliet Arsenal and requires inspection, with performance in Watervliet, New York. Offers are due September 2, 2026, at 4:00 p.m. EDT.
FederalNY
Dec 11, 2025
Closes
Dec 23, 2026
The U.S. Army (Watervliet Arsenal) seeks a contractor to evaluate the fire suppression system in Building 126, remove one zone, modify and re-evaluate the system, and provide stamped engineered drawings. The scope includes removing steel shelving units, bringing the fire suppression system up to code, and complying with Service Contract Labor Standards; the project is expected to take about 90 days. This is a Department of Defense solicitation (Total Small Business Set-Aside) posted on SAM.gov with a bid due date of December 23, 2026.
Procurement and program contacts connected to W6QK Army Contracting Command (ACC) Watervliet Arsenal.