Open RFP

Railroad Timber Bridge Replacements: Basalt Creek & San Antonio Slough

Description: Work consists of replace two existing timber railroad bridges with steel open deck bridges on steel piles and precast abutments and wingwalls. The replacement bridges are longer than the existing bridges and are to be installed behind existing abutments and headwalls, which are to remain in place.

Buyer
Released
-
Closes
Oct 21, 2026(18 days left)

Files

Original attachments and procurement documents tied to this bid.

See your top accountsScan your site in seconds. Starbridge identifies your ICP and surfaces emerging opportunities from board meetings, job changes, new grants, contract expirations, RFPs, and more.
See your top 10 accounts