New York State Department of Transportation
State AgencyNY
Posted
Nov 18, 2026
Dec 17, 2026
Railroad Crossing Enhancement D265866 RFP
Work include railroad crossing enhancement.
Description: Reconstruction of thirteen (13) existing at- grade railroad crossings.
City · WI, US
From the first pre-RFP signals to the published RFP and its files.
Proposed budget
726 days before RFP
Port Milwaukee's 2025 proposed budget listed $300,000 for Rail Track & Service Upgrades.
1 PORT MILWAUKEE 2 3 Pier, Berth and Channel Improvements 4 0481 9990 R999 PT180000200 56,036 500,000 New Borrowing 490,000 500,000 5 Cash Levy 6 Cash Revenues 7 \[800,000\] Grant & Aid \[800,000\] \[800,000\] 8 9 Terminal & Facility Maintenance 10 0481 9990 R999 PT180210100 1,000,000 New Borrowing 490,000 200,000 11 Cash Levy 12 Cash Revenues 13 Grant &…
City of Milwaukee FY2025 Proposed Budget
Proposed budget · Sep 13, 2024
Proposed budget
Port Milwaukee’s 2027 proposed capital budget includes $600,000 for continued repair and replacement of more than 14 miles of Port rail track, with FRPP grants often supplementing the work.
Rail Track & Service Upgrades: The 2027 capital budget provides $600,000 to continue repairing and replacing more than 14 miles of Port's rail track to address safety and service load requirements in compliance with state and federal regulation. Grant funding through the Wisconsin Department of Transportation's Freight Railroad Preservation Program (FRPP)…
City of Milwaukee FY2027 Proposed Budget
Proposed budget · 2026
RFP published
Proposals due (Closed)
These related opportunities are still open for bidding.
New York State Department of Transportation
State AgencyNY
Posted
Nov 18, 2026
Dec 17, 2026
Work include railroad crossing enhancement.
CityTX
Posted
Oct 16, 2026
Dec 3, 2026
Work consists of the reconstruction of Chapman Street from Augusta Street to Curry Drive, the entire length of Independence Drive, and Bartlett Place from cul-de-sac to Clover Valley Dr. The work includes, but is not limited to, mobilization, preparation of right-of-way, traffic control, approximately 16,200 SY of 6-inch thick reinforced concrete pavement on flex base subgrade, and approximately 40,000 SF of 4-inch thick reinforced concrete sidewalks, approx. 2,300 LF of 8-inch diameter sanitary sewer, 1,100 LF of 18-inch diameter sanitary sewer, 4,400 LF of 8-inch water line, and any other work deemed necessary by the City.
Special DistrictIA
Posted
-
Dec 10, 2026
Work generally consists of: 5,600 SY of pavement removal; 7,000 CY of cl 10 excavation for roadway construction; 11,700 CY of airport-furnished granular backfill; 3,300 CY modified subbase; 700 LF of RCP storm sewer; 3,200 SY of PCC sidewalk. See outside link.
CityOH
Posted
Nov 20, 2026
Dec 11, 2026
The City of New Albany seeks sealed bids for a roughly 2,500-foot Ganton Parkway extension, including roadway work, drainage, utilities, traffic signals, lighting, curb ramps, and landscaping. The project has an engineer’s base-bid estimate of $8.5 million and requires a bid guaranty, prevailing-wage compliance, and documentation of relevant project experience. Substantial completion is due by March 31, 2028, with final completion by May 28, 2028.
Decision makers connected to this RFP from City of Milwaukee.