Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Replacement and/or installation of approx. 1,100 LF of 8" diameter, approx. 3,740 LF of 18" diameter, approx. 3,130 LF of 21" diameter, and approx. 380 LF of 30" diameter PVC sanitary sewer pipe; replacement and/or installation of 39 manholes; replacement of approx. 47 sanitary sewer laterals; two stream crossings; bypass pumping; tree removal and protection; surface restoration; and all other work
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
The City of Sacramento is soliciting qualifications from a qualified engineering consultant team to provide preliminary engineering, public and stakeholder outreach, utility coordination, right-of-way services, environmental clearance, final design, preparation of plans/specifications/estimates, bidding assistance, and design services during construction for the Dixieanne Alleyways Improvements Project – Phase 2. The work focuses on improving public alleyways in the Dixieanne neighborhood of Old North Sacramento and implementing low-stress pedestrian and bicycle routes. This is an RFP for professional services (not a grant) with an estimated value range noted on the posting.
Posted Date
Jan 7, 2026
Due Date
Feb 6, 2026
Release: Jan 7, 2026
Close: Feb 6, 2026
The City of Sacramento is soliciting qualifications from a qualified engineering consultant team to provide preliminary engineering, public and stakeholder outreach, utility coordination, right-of-way services, environmental clearance, final design, preparation of plans/specifications/estimates, bidding assistance, and design services during construction for the Dixieanne Alleyways Improvements Project – Phase 2. The work focuses on improving public alleyways in the Dixieanne neighborhood of Old North Sacramento and implementing low-stress pedestrian and bicycle routes. This is an RFP for professional services (not a grant) with an estimated value range noted on the posting.
AvailableProject includes roadway, sidewalk, path, storm sewer, street lighting, and water main improvements. Roadway improvements consist of over 24,500 SY of full reconstruction, over 12,500 LF of curb replacement, more than 7,500 LF of storm sewer, bridge/culvert/retaining wall work, traffic signal improvements, and other related work.
Posted Date
Jan 8, 2026
Due Date
Feb 6, 2026
Release: Jan 8, 2026
Close: Feb 6, 2026
Project includes roadway, sidewalk, path, storm sewer, street lighting, and water main improvements. Roadway improvements consist of over 24,500 SY of full reconstruction, over 12,500 LF of curb replacement, more than 7,500 LF of storm sewer, bridge/culvert/retaining wall work, traffic signal improvements, and other related work.
AvailableRelease: Dec 23, 2025
Close: Feb 5, 2026
Road improvements project.
AvailableConstruction of a Capital Improvements Project - Phase 3 as follows: Mechanical Construction Contract; Electrical Contract. This project includes adding air conditioning systems in classrooms within the buildings.
Posted Date
Jan 9, 2026
Due Date
Feb 5, 2026
Release: Jan 9, 2026
Close: Feb 5, 2026
Construction of a Capital Improvements Project - Phase 3 as follows: Mechanical Construction Contract; Electrical Contract. This project includes adding air conditioning systems in classrooms within the buildings.
AvailableSurface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis