Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Work consists of: concrete, remove, 169 SY; subgrade treatment, Type II, 1402 SY; subgrade treatment, Type III, 169 SY; HMA patching, full depth, Type B, 387 TN; milling, asphalt, 1 1/2-IN, 10892 SY; milling, asphalt, 1/2-IN, 7180 SY; QC/QA-HMA, 2, 58S, surface, 9.5 mm, 1492 TN; asphalt for tack coat, 6 TN; parking barrier, reset, 32 EA; casting, manhole, adjust to grade, 14 EA; construction sign, Type A, 6 EA; maintaining traffic, 1 LA.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work consists of: pavement removal, 500 SY; remove sidewalk concrete, 60 SY; common excavation, 35 CY; compacted aggregate, no. 53, 100 TN; compacted aggregate, no. 73, 70 TN; HMA patching, full depth, Type C, 300 TN; HMA patching, partial depth, Type C, 300 TN; HMA patching, partial depth, Type D, 250 TN; asphalt milling, 1 1/2-IN, 5000 SY; milling, asphalt, 2-IN, 5000 SY; HMA wedge and level, Type C, 250 TN; HMA wedge and level, Type D, 250 TN; asphalt for tack coat, 6 TN; PCCP patching, full depth, 425 SY; sidewalk, concrete 5SY; curb ramp, concrete, 50 SY; temporary pavement marking, removable, 4-IN, 2500 LF; line, paint, broken, yellow, 6-IN, 2600 LF; 4-IN, 2500 LF; line, paint, broken, white, 6-IN, 5280LF.
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Close: Feb 11, 2026
Work consists of: pavement removal, 500 SY; remove sidewalk concrete, 60 SY; common excavation, 35 CY; compacted aggregate, no. 53, 100 TN; compacted aggregate, no. 73, 70 TN; HMA patching, full depth, Type C, 300 TN; HMA patching, partial depth, Type C, 300 TN; HMA patching, partial depth, Type D, 250 TN; asphalt milling, 1 1/2-IN, 5000 SY; milling, asphalt, 2-IN, 5000 SY; HMA wedge and level, Type C, 250 TN; HMA wedge and level, Type D, 250 TN; asphalt for tack coat, 6 TN; PCCP patching, full depth, 425 SY; sidewalk, concrete 5SY; curb ramp, concrete, 50 SY; temporary pavement marking, removable, 4-IN, 2500 LF; line, paint, broken, yellow, 6-IN, 2600 LF; 4-IN, 2500 LF; line, paint, broken, white, 6-IN, 5280LF.
AvailableWork consists of: HMA patching, full depth, Type B, 414 TN; HMA patching, partial depth, Type B, 1015 TN; asphalt for tack coat, 4 TN; construction sign, Type A, 41 EA; maintaining traffic, 1 LS; construction signs mobile, 90 day; line, paint, broken, yellow, 6-IN, 2420 LF; line, paint, solid, white, 6-IN, 9736 LF; line, paint, solid, yellow, 6-IN, 3797 LF.
Posted Date
Jan 14, 2026
Due Date
Feb 11, 2026
Release: Jan 14, 2026
Close: Feb 11, 2026
Work consists of: HMA patching, full depth, Type B, 414 TN; HMA patching, partial depth, Type B, 1015 TN; asphalt for tack coat, 4 TN; construction sign, Type A, 41 EA; maintaining traffic, 1 LS; construction signs mobile, 90 day; line, paint, broken, yellow, 6-IN, 2420 LF; line, paint, solid, white, 6-IN, 9736 LF; line, paint, solid, yellow, 6-IN, 3797 LF.
AvailableApprox. 4,489 SY of partial depth pavement patching, 4,830 SY of full depth pavement patching, 21,500 SY of diamond grinding, 298 STA of painted pavement markings, 375 SY of PCC Median Edge and miscellaneous related work and appurtenances.
Posted Date
Jan 14, 2026
Due Date
Feb 10, 2026
Release: Jan 14, 2026
Close: Feb 10, 2026
Approx. 4,489 SY of partial depth pavement patching, 4,830 SY of full depth pavement patching, 21,500 SY of diamond grinding, 298 STA of painted pavement markings, 375 SY of PCC Median Edge and miscellaneous related work and appurtenances.
AvailableIowa State University is soliciting contractors to perform pavement preservation and concrete patching for Parking Lot 2 and the ground-level parking around the East Campus Parking Deck. The scope includes removal and replacement of PCC and HMA pavement, storm sewer and lighting work, pavement markings, and finish grading. Construction is scheduled to begin in May 2026 with completion expected by August 2026.
Posted Date
Jan 27, 2026
Due Date
Feb 24, 2026
Release: Jan 27, 2026
Close: Feb 24, 2026
Iowa State University is soliciting contractors to perform pavement preservation and concrete patching for Parking Lot 2 and the ground-level parking around the East Campus Parking Deck. The scope includes removal and replacement of PCC and HMA pavement, storm sewer and lighting work, pavement markings, and finish grading. Construction is scheduled to begin in May 2026 with completion expected by August 2026.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis