Jul 15, 2026
Closes
Sep 19, 2026
The Orange Beach Waterfront Park Restoration RFP
Work inlcudes build three riprap breakwaters to protect the pocket beach near the wind and water learning center.
Description: Work includes park waterfront reconstruction.
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Jul 15, 2026
Closes
Sep 19, 2026
Work inlcudes build three riprap breakwaters to protect the pocket beach near the wind and water learning center.
CityNY
Jul 20, 2026
Closes
Aug 27, 2026
Construct the southern gateway park by repurposing the old railway bed into a durable, shared use, ada compliant trail. Additional park features include signage, parking area, picnic tables and shade trees. The project will also include but not be limited to waterfront amenities including an accessible canoe/kayak launch, kayak storage rack and launch site signage, and benches.
CountyNC
Aug 5, 2026
Closes
Aug 28, 2026
Guilford County is seeking letters of interest from qualified professionals for design and engineering services for Guilford-Mackintosh Park Waterfront Improvements. The work includes schematic design, design development, construction documentation, permitting, bidding assistance, and construction administration to create a fully designed, permitted, and buildable public recreation destination. Proposed amenities include waterfront improvements, accessible fishing opportunities, kayak access, a shelter, gathering spaces, play elements, and supporting site infrastructure.
Jun 16, 2026
Closes
Oct 21, 2026
Work includes approx. 10 LF of 8" dia ductile iron sewer pipe; 20 LF of 12" dia polyethylene corrugated pipe; 240 LF of television inspection for drain lines; 30 LF of 1" dia type K copper tubing; 540 LF of 1 1/2" dia type K copper tubing; 168 LF of 2" dia type "K" copper tubing; 1,420 LF of garden pipe railing.