PWC Punderson Sidewalk Repair and Repour (Request for Quote)

Description: Work includes park side walk repairs. Remove gravel and prep the area for the form. Ensure there is enough base for concrete sidewalk. The new pour should tie into the existing sidewalk. The sidewalk should be reinforced with rebar with a slump of 4" to 1" and a 5-8% air entrainment with a 4,000 psi compressive strength at 28 days. The area is 4' x 10'.

Buyer
PWC Punderson State Park

StateAgency · OH, US

Released
Jul 14, 2026
Closes
Aug 25, 2026(11 days left)