Discover opportunities months before the RFP drops
Learn more →Retrieving RFP details
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis
Construction, water system/plants, main and service line - sheathing and shoring; reinforced steel; welded steel wire fabric; welded steel wire fabric with epoxy coating; saw cutting - roadway; saw cutting - footway; modified stone for vaults; modified material; modified stone for subgrade; modified stone - soft spots; pipe foundation underdrain; sand backfill; ductile iron pipe - 4"; ductile iron pipe - 6"; ductile iron pipe - 8"; ductile iron pipe - 12"; ductile iron gate valve - 4"; ductile iron gate valve - 6"; ductile iron gate valve - 8"; ductile iron gate valve - 12"; ductile iron fittings; steel harness for pipe restrainment; standard 7" water valve box; reset standard 7" water valve box; water service relay - 3/4"; water service relay - 1"; water service relay - 1.5"; water service relay - 2"; water service ferrule - 3/4"; water service ferrule - 1"; water service curb stop - 3/4"; water service curb stop - 2"; water service box; hdpe subdrain; V.C. sewer pipe - 5 or 6"; V.C. sewer pipe - 8"; saddle connection - 5 and 6"; saddle connection - 8 inch; V.C. pipe bends - 5 or 6"; R.C. sewer pipe - 15"; manholes for sewers - 30" and under; manhole frame and cover; setting or resetting manhole frame and cover; stormwater inlets - 4 ft OMG; stormwater inlets - 4 ft city inlet; precast concrete inlet top slab - 4 ft city inlet; reset inlet top - up to 4"; dripstone - 2" thick; fill abandoned inlet; fill abandoned manhole; fill abandoned sewers; sewer vent; vent pipe; concrete roadway paving; milling of asphalt; concrete base course - 8"; asphalt wearing course - 1.5"; thermoplastic pavement markings - 4"; thermoplastic pavement markings - 6"; pavement marking removal; vehicle removal; mechanical street sweeping; concrete cradle for sewers.
Starbridge can help you:
Pain points mentioned in board meetings and strategic plans
Instantly outline and draft all requirements
Bring in your USPs and exploit competitor gaps
Starbridge can help you:
Get ahead of RFPs — target accounts planning budget or ending contracts soon
Accounts with contract expirations, meetings mentioning your product, grants, budget changes and more
Starbridge.ai books 30 - 40% of leads into meetings
Work for which consists of the removal, hauling, and beneficial use of drinking water treatment residuals and grit from hap cremean water plant lagoon no. 2, cell a, vegetation removal and disposal, and other such work.
Posted Date
Dec 17, 2025
Due Date
Jan 21, 2026
Release: Dec 17, 2025
Close: Jan 21, 2026
Work for which consists of the removal, hauling, and beneficial use of drinking water treatment residuals and grit from hap cremean water plant lagoon no. 2, cell a, vegetation removal and disposal, and other such work.
AvailableThis RFP is for the removal of residuals and organics (including sediment and vegetation) from Water Treatment Plant Lagoons 3 and 5, with materials to be transported to an onsite holding area.
Posted Date
Dec 29, 2025
Due Date
Jan 12, 2026
Release: Dec 29, 2025
Close: Jan 12, 2026
This RFP is for the removal of residuals and organics (including sediment and vegetation) from Water Treatment Plant Lagoons 3 and 5, with materials to be transported to an onsite holding area.
AvailableLoad, haul, and dispose of water treatment plant residuals from backwash basin #1.
Posted Date
Jan 5, 2026
Due Date
Jan 15, 2026
Release: Jan 5, 2026
Close: Jan 15, 2026
Load, haul, and dispose of water treatment plant residuals from backwash basin #1.
AvailableWork includes 3,530 CY of excavation for pipe sewers; 2,350 LF of 18" rcp sewer; 280 LF of 21" rcp sewer; 2,750 LF of concrete curb; 2,700 SY of concrete footway paving; 300 SY of milling; 2,100 SY of subbase, 6" depth, including subgrading; 2,100 SY of plain cement concrete base course, 8" depth; construction and as builts of 12 EA 6" thick ADA ramps; 1,300 CY of excavation for water mains; 3,070 LF of 8" DI pipe; 3,300 LF of 3/4" copper service pipe from water main to curb stop and associated works. See attached files.
Posted Date
Dec 12, 2025
Due Date
Jan 27, 2026
Release: Dec 12, 2025
Close: Jan 27, 2026
Work includes 3,530 CY of excavation for pipe sewers; 2,350 LF of 18" rcp sewer; 280 LF of 21" rcp sewer; 2,750 LF of concrete curb; 2,700 SY of concrete footway paving; 300 SY of milling; 2,100 SY of subbase, 6" depth, including subgrading; 2,100 SY of plain cement concrete base course, 8" depth; construction and as builts of 12 EA 6" thick ADA ramps; 1,300 CY of excavation for water mains; 3,070 LF of 8" DI pipe; 3,300 LF of 3/4" copper service pipe from water main to curb stop and associated works. See attached files.
Surface intent from meeting minutes, budgets, and contract expirations. Influence RFP requirements before competitors ever see them.
See your top 10 upcoming opportunities on a demo →Premium
Access the largest public sector contact database
Premium
Get complete source documentation & analysis